AMIRBHAI G.

Amirbhai g.

bookmark on deepenrich
location of AMIRBHAI G.Noida, Uttar Pradesh, India
Phone number of AMIRBHAI G.+91 xxxx xxxxx
Followers of AMIRBHAI G.785 followers
  • Timeline

    Mar 2015 - Nov 2017

    Executive Engineer

    Expel Prosys Private Limited
    Nov 2017 - Oct 2018

    Testing and Commissioning Engineer

    AL AHLEIA SWITCHGEAR CO. KSCC
    Apr 2019 - Apr 2024

    Deputy Manager

    Schneider Electric
    Vadodara, Gujarat, India
    Current Company
    May 2024 - now

    LV secondary system engineer

    GE Vernova
  • About me

    Electrical Engineer l HVDC l FAT l LV,AIS,GIS,PSS. ex- Schneider electric.

  • Education

    • V.v.p engineering collage,rajkot

      2011 - 2014
      Bachelor of engineering (be) electrical engineering 8.03 cgpa

      Activities and Societies: Project - Modern day solar farming

    • The maharaja sayajirao university of baroda

      2008 - 2011
      Diploma electrical engineering 70.2 %
  • Experience

    • Expel prosys private limited

      Mar 2015 - Nov 2017
      Executive engineer

      Involved in various types of testing activity in electrical switchgears like testing and commissioning of substations which includes HV, LT, CRP & RMU Panels, interlocking scheme, relay Logic, CRM & Timing of breaker, relay all functional test, HV-IR of cables, transformer testing, signal check and establish communication as documents/site.

    • Al ahleia switchgear co. kscc

      Nov 2017 - Oct 2018
      Testing and commissioning engineer

      Demonstrating SAT of substation switchgear panels to customer with full satisfaction and requirements.

    • Schneider electric

      Apr 2019 - Apr 2024

      1) Proficient in conducting thorough Factory Acceptance Tests (FAT) and Site Acceptance Tests (SAT) to validate the functionality and reliability of electrical switch boards like LV, MV,AIS,GIS,RMU,PSS while ensuring strict adherence to all safety standards & Customer satisfaction with all technical requirements.2) responsible for presenting all relevant documents/reports and ensuring any detected issues (snag list) are closed. Work closely with the Project Manager to close actions with support & co-ordination design, production, quality, site team and customer to resolve any outstanding issues. Take proactive measures to ensure the smooth completion of the FAT process.3) Provide support to assembly technicians or site team by Prepare relay programming file, Load PSL(logic) and validate, IED 61850, configuring thermal(TH110) and ambient(CL110) temp sensors, troubleshooting issues, conducting root cause analysis, calibrating instruments, updating testing procedures, red markup drawing, generating reports, and ensuring facilities are updated according to guidelines. Taking effective steps to enhance processes, performance, and procedures of system. Show less

      • Deputy Manager

        Jun 2022 - Apr 2024
      • Testing Engineer

        Apr 2019 - Jun 2022
    • Ge vernova

      May 2024 - now
      Lv secondary system engineer

      Prepare and present technical information on HVDC substation control systems to internal and external clients.

  • Licenses & Certifications

    • Legal requiremnt- 111a- industrial safety training (electrical safety)

      Patel dilipbhai motibhai
      Nov 2022