
Timeline
About me
MEP Professional / Project Management/ Design Engineering/ Site Supervision
Education

Patilar high school
1985 - 1986High school electrical and electronics engineering a,75%
Aligarh muslim university
1990 - 1994Bachelor’s degree (electrical) 66%Machine, Power System and control,EMF, Con/Non Conventional Energy system and circuit theory.

Aligarh muslim university
1994 - 1995Post graduate diploma in computer application. computer hardsware and software. 75%Computer engineering

Aligarh muslim university
1988 - 1990Diploma in instrumentation electrical and electronics engineering 85+%
Aligarh muslim university
1986 - 198810+2 pcm 60%
Experience

Saudi-german breakshoes manufacturing-jeddah-k.s.a
Jul 1995 - Dec 1998Electrical engineerWorked with SGB-Jeddah-K.S.A.Responsible forDesigning and preparation of drawings, for complete Electrical & Low Current services for Automobile break shoes Factories and offices.•Calculation of MDL&TCL, Cables Selection, and Voltage-drop calculation for cables Preparation of Load Schedule for MDB, SMDB& Final DB distribution strategy with Earth-leakage & Lightening protection etc. Proposing for substation and transformer if required.•Short circuit calculation from upstream to down stream in power distribution system, i.e. starting from transformer to MDB, MDB to SMDB &SMDB to Final DB and Bus Bar installations.•Supervising Electrical work and checking Quality of material supplied at site according to the approved standards.•Attending the in process and final inspection of LV-panel and other related break shoes manufacturing machines such as Power Press, Hydraulic Press. Grinding m/c, shearing m/c and painting m/c at factory. Show less

M.h.m construction-qatar.
Feb 1999 - May 2005Project engineer-mepWorked with M.H.M,Doha-Qatar.Involved in electromechanical works in building services.Responsibile for•Preparation, review and update of short term of working programmes in terms of labour, plant and timescales, for designation of supervisory staff and labour for work.•To report a process any identified deficiencies or concerns during any phase of the project in accordance with Quality Assuranceprocedures.•Maintain site-working practices in accordance with company's Health and Safety procedures.•Prepare and maintain accurate registers for materials and drawing schedules.•Preparation of weekly/ monthly progress reports.•Preparing drawings for submission to Kahramaa for approval of NOC, Estimates, substation requirements,reviewing and modifying drawings for submission to Kahra-Maa for approvals.•Site supervision for the on going projects, Supervision of Electrical work and checking Quality of material supplied at site according to the approved standards. This includes attending project management meeting at site with client, main contractor& suppliers etc. Show less

Al arabia electro mechanical l.l.c
Jan 2005 - Jan 2008Lead principal electrical engineer-mep.Worked with J&M EMW-Dubai.Involved in Electromechanical works in building services•Managing & Co-ordination of all project drawings, and associated technical data, gaining necessary approvals andensuring the distribution and availability of the data. Selecting, sourcing, scheduling and cost appraisals of all purchased materials in consultation with project manager.•Preparation, review and update of short term of working programmes in terms of labour, plant and timescales, for designation of supervisory staff and labour for work.•To report a process any identified deficiencies or concerns during any phase of the project in accordance with Quality Assurance procedures.•Maintain site-working practices in accordance with company's Health and Safety procedures.•Prepare and maintain accurate registers for materials and drawing schedules.•Preparation of weekly/ monthly progress reports.•Preparing drawings for submission to DEWA for approval of NOC, Estimates, substation requirements; reviewing and modifying drawings for submission to DEWA for approvals.•Site supervision for the on going projects, Supervision of Electrical work and checking Quality of material supplied at site according to the approved standards. This includes attending project management meeting at site with client, main contractor& suppliers etc.•Coordination of BMS controls, Fire Alarm, CCTV system, CBS, Access Control System, PA/ BGM, SMATV, SCS, PMS and telephone networks with suppliers and authorities like Etisalat, Du, Dubai Civil Defence etc.•Attending in process & final inspection of LV-panel and other related switchgear and control gear manufacturing at factory. Supervising the testing and commissioning of ATS,A.C.B Panel ,Synchronizing Panel,M.C.C (including .V.F.D,Soft Starter and timer+contactor logic) and LV- Panel with all related switchboards and accessories.Supervising the testing and commissioning of ATS and LV- Panel with all related switchboards and accessories. Show less

Scott wilson-dubai
May 2008 - Apr 2009Engineering manager-mepJob Description & Responsibilities: -Development of basic design philosophy and preliminary design concept report as per international and local regulatory codes like DEWA, SEWA, ETISALAT, DU and Civil Defense etc for electrical building services in conjunction with architectural model and client’s requirement.Preparation of drawings, schedule, documentation at preliminary design stage and detail design stage. Updating electrical specifications as per approved design brief by client for a particular project.Coordinating with architects, structural and other discipline for fulfilling spatial requirements of rooms for HV, transformer, LV, UPS/ battery, DG, telecommunication rooms and electrical services risers Development of electrical distribution, single line diagrams for LV power distribution system starting from LV-panel, SMDB and Final DB.Preparation of load schedule at LV-Panel, MDB, SMDB & Final DB level, voltage-drop calculation, cables selection & sizing, DG selection & sizing. Provision for electrical connection for other mechanical equipment. Deciding routing for cables/ bus bar risers.Development of Substation proposal and sizing as per the quantity of transformers required as per total connected load.Designing of fire alarm system, central battery emergency lighting system and voice evacuation system confirming to local Civil Defense regulations.Telephone service designing and confirming the requirements of Etisalat and TECOM for telephone cable incomer, telephone room, riser and floor distribution network.Designing of other low current services like gate barrier system, access control, CCTV and security system, SMATV network, back ground music system, interfacing with BMS and home automation system. Show less

Arif & bintoak
Apr 2009 - Apr 2011Sr.engineering manager-mepJob Description & Responsibilities for 330 million dirham MEP worksPlan, manage, lead, control, MEP work teamEnsure management of the MEP design process in accordance with company policy, procedures and the Design Management PlanDevelop the MEP Project design brief (concept) and maintain by regular reviewManage the MEP design including all inputs, coordination and deliverables to achieve the time, cost, and quality objectivesArrange full construction (MEP Installation & planning) support during the design phase to maximize constructabilitySet-up & monitor a MEP design quality plan, linking Designers quality plans with a regular review and audit functionEnsure that the design intent and design performance criteria are maintained through the design development and construction processReport immediately any event which will significantly change previous forecasts and/or seniorm anagement expectations of the next forecastsLead problem solving and resolution of design issuesIdentify issues causing risk or delay to the projectOther tasks assigned by Directors. Show less

Hastie new zealand
Apr 2011 - Apr 2012Mep deign head-projects.• Liaise with client, developer, consultants and contractors as well as Hastie internal project and construction management and supervision, planning, engineering & design divisions.• Support the delivery of the contracted MEP Engineering services to the client.• Participate in establishing and implementing the Project Management Plan and / or Design Implementation Plan and procedures.• Prepare tender strategy; identify qualified consultants, contractors and vendors; prepare and issue RFP’s; evaluate proposals; negotiate contract terms/deliverables/payment schedules; and issue recommendation to the client.• Oversee and guide consultants design progress activities. Monitor and verify design progress and submittals at all design phases.• Attend or chair meetings and / or workshops with consultants and contractors, prepare meeting minutes and follow up to achieve identified actions.• Organize/manage design review meetings, workshops and reports during design phases• Advise the Project Director / Manager on all matters pertaining to cost scope and schedule with regards to design development. Show less

Lodha group
Apr 2012 - Dec 2017Gm-mepResponsible for complete construction & project management of INR 200 Cr. MEP (HVAC Systems, Plumbing, Fire Fighting & Electrical) Works, Elevators, Solar System, Rain Water Harvesting, Garbage Chute, Water Bodies, Swimming Pool, etc at New Cuffe Parade Township Project (Plot area 23 acres, total built-up area 120 lakh sq. ft., 4200 apts) consisting of 13 nos. high rise (46+4 basements) commercial (LEED Platinum) & residential designer & luxurious towers, basements, clubhouse, water bodies, swimming pool, stadium, etc. at Wadala, Mumbai, India.Drove year-over-year business growth while leading operations, strategic vision, and long-range planning. Established and administered annual budget with controls to prevent overages, minimizing burn rate, and support sustainability objectives.Enhanced operational efficiency and productivity by managing budgets, accounts, and costs. Developed and maintained relationships with customers and suppliers through account development. Organized budgets, oversaw P&Ls, and achieved margin targets consistently to stay on track with growth plans.Assessed reports to evaluate performance, develop targeted improvements and implement changes.Designed a modern employee recognition program which boosted productivity and improved morale.Delivered business strategy and developed systems and procedures to improve operational quality and team efficiency.Set, enforced, and optimized internal policies to maintain responsiveness to demands.Reduced process bottlenecks by training and coaching employees on practices, procedures, and performance strategies.Assessed supplier quality to maintain tight cost controls and maximize business operational performance. Reduced costs, managed delivery schedules, and performed risk analysis to improve overall profitability. Maximized efficiency by coaching and mentoring personnel on management principles, industry practices, company procedures, and technology systems.Managed budget implementations. Show less

Al faraa construction and industrial group
Dec 2017 - Dec 2019Project and operations managerResponsible for A.E.D200 million Emaar Creek Harbour View-DXB Proj.Established and administered annual budget with controls to prevent overages, minimize burn rate and support sustainability objectives. Devised processes to boost long-term business success and increase profit levels. Investigated and resolved departmental non-conformances. Planned and resourced personnel and logistics for operations component exercises resulting in highly trained personnel ready to act quickly in critical roles. Collaborated with process owners to refine procedures, devise best practices, and correct quality audit findings. Spearheaded department training for appraisals of new components. Partnered with vendors and suppliers to effectively manage and budget. Advanced productivity KPIs by leading training on procedures and safety practices. Established positive and effective communication among unit staff and organization leadership, reducing miscommunications and missed deadlines. Assessed supplier quality to maintain tight cost controls and maximize business operational performance. Led warehouse improvement initiatives to advance operational efficiencies and increase revenue. Reduced process bottlenecks by training and coaching employees on practices, procedures, and performance strategies. Implemented ticket tracking system and worked with the team to create a customized system for improved tracking and logging of work issues. Reviewed shift reports understanding current numbers and trends. Formulated processes to improve assistance to support groups, resulting in a reduction of downtime and financial loss. Identified and resolved unauthorized, unsafe or ineffective practices. Directed initiatives to achieve regulatory compliance, foster good manufacturing practices and meet component quality standards. Show less

Star cool
Mar 2020 - nowHead of project.mepKey Expertise :** MEP Project Management Construction Management** Site Supervision and Coordination Budget Analysis Cost Control** Engineering and technical Support Vendor Relations / Material Management** Design Reviews and Analysis Control MEP Installation, Testing & Commissioning** Strategic Planning and Management Safety Procedures / Quality Control** Estimation and Techno-commercial Operation Risk Management** Resource Planning and Management Communication Management** Contract Terms & Conditions Design Reviews / Analysis & Control** Stakeholder Management Team Management Show less
Licenses & Certifications

Project management
Apr 2008
Honors & Awards
- Awarded to FAIZ AHMADKRA -rating- Very Good Lodha Group. Mar 2016 As an outcome of the performance review 2015-16, your performance has been rated as Good.Your individual remuneration is purely a matter between yourself and the company and hasbeen arrived on the basis of your job, skills, specific background and professional merit.
- Awarded to FAIZ AHMADLITE LODHA Sep 2015 Part of Lodha Internal Trainer Enclave .Giving contribution in driving training programs in building a stronger culture of learning and knowledge sharing at Lodha.
- Awarded to FAIZ AHMADG.E.T SELECTION FOR 2016. LODHA-MEP Aug 2015 Being part of panel expert for graduate engineering trainee selection for mep cell for 2016.
- Awarded to FAIZ AHMADGET-Selection GET selection Jul 2015 GET- MEP services.
Volunteer Experience
PLC PROGRAM
Issued by INDO ITALIA
Associated with FAIZ AHMAD
Languages
- arArabic
- enEnglish
- hiHindi
- urUrdu
Recommendations

Giri madhav
Actively seeking full time opportunities | Ex Data Science intern at HGS Digital | MSCS at UICChicago, Illinois, United States
Krutarth desai
Project Engineer at Thornton TomasettiMumbai, Maharashtra, India
Reista fatikah maldhani
PR Officer | Fresh Graduate of English for Business and Professional CommunicationKota Malang, Jawa Timur, Indonesia
Thazin phyo
Senior System Engineer at NTT Data MyanmarYangon, Myanmar
Shu run goh
Supply Chain Planning ManagerSingapore
Mohan thoka
Frontend Developer | HTML5, CSS3, JavaScript, Bootstrap, React JS, ReduxChittoor, Andhra Pradesh, India.webp)
Zvenyika zvenyika ca (z)
Finance Executive at OLD MUTUAL ZIMBABWEZimbabwe
Wouter eggink
Assistant professor Design, Technology and HistoryDeventer, Overijssel, Netherlands
Alessia bertolino
Master degree in Hospitality Management. Specializing in the hospitality business and property renta...Palermo, Sicily, Italy
Ali khyatti
CEO Thinkable Morocco | Automating the Software Creation with Multi-Agents | AI Crafter | Helping LL...Rabat, Rabat-Salé-Kénitra, Morocco
...