Mohd Asyraf Zainal Abidin

Mohd asyraf zainal abidin

bookmark on deepenrich
location of Mohd Asyraf Zainal AbidinWilayah Persekutuan Kuala Lumpur, Malaysia
Phone number of Mohd Asyraf Zainal Abidin+91 xxxx xxxxx
  • Timeline

    Jun 2009 - Jan 2012

    Construction Engineer

    Sapura Kencana Pinewell Sdn Bhd
    Jan 2012 - Jan 2016

    Construction Engineer / Company Site Representative

    Petronas Carigali Sdn Bhd
    Jun 2016 - Jan 2016

    Project Engineer

    Rotary Engineering Limited
    Current Company
    Sept 2016 - now

    Site Engineer / QC Engineer

    ISHI Power Sdn Bhd
  • About me

    Project Engineer / Construction Engineer

  • Education

    • University putra malaysia

      2005 - 2009
      Electrical and electronics engineering power
    • Universiti putra malaysia

      2005 - 2009
      Bachelor of electrical & electronic engineering power

      Aktiviti dan Persatuan:• Committee for National Career Carnival in UPM • Committee in 10th College (K10) High Dinner • Committee for “Senandung Irama Dikir Barat” contest • Committee for Industrial Training Seminar Major in Power for Degree of Electrical and Electronics Engineering

  • Experience

    • Sapura kencana pinewell sdn bhd

      Jun 2009 - Jan 2012
      Construction engineer

       Assist Work pack Team Leader in completing Onshore Fabrication Work pack and Offshore Work pack including SISO / SIPROD requirement, tools & equipment list and required documents. Coordinate movement of project equipment, material, consumable and mobilization and demobilization of manpower and vendors. Prepare and submit to client the required Working Procedure / Method Statement for various projects involved. Review and prepare TBE and TC for certain project materials during procurement stage.  Conduct and lead site survey prior to offshore mobilization to identify any constraints or deviation from the scope and drawings.  Updating and send report to Project Team and Client for daily progress achievement at site and highlight any constrains arise. Perform pre-commissioning and commissioning activities for mechanical/piping package through system by system commissioning prior to handover to OperationPROJECT INVOLVEMENTS & DURATION:1) HUC for Kinabalu Gas Processing Platform KNPG-B Project  March-12 till Oct-122) HUC for Samarang Redevelopment Project Phase 1 July-10 till March-123) Kumang Cluster Development Project March-10 till July-104) Betty Revisit 4 Phase II Jan-10 till March-105) HUC for 10’ X 20.754 KM Pipeline PL347 from BEP-A to BKP-A July-09 till Dec-09 Tunjukkan kurang

    • Petronas carigali sdn bhd

      Jan 2012 - Jan 2016
      Construction engineer / company site representative

       Assigned as CSR cum Construction Engineer for various Hook-Up & Commissioning campaign in Samarang field during this period. Responsible for managing day-to-day site operations related to contractors, HSE, scope management, work progress, marine spread and quality control in order to be in line with project direction and target.  Witness, review and verify the installation, testing as well as commissioning of all required package. Review and confirm system handover had been completed for each sub-sub system prior to handover to Operation following CSP21 Upstream Facilities Handover Procedure.  Performed various preparation work on Anchor Pattern for workboat for marine spread scope. Ensure smooth preparation of manpower, tools and equipment during various stage of critical shutdown Turnaround activities. Continuously ensure that all project / company HSE goals are achieved and where possible exceeded by liaising with HSE team.PROJECT INVOLVEMENT & KEY POINTS:1) HUC for Samarang EOR Infill Drilling SMJT-G / SMDP-B Project Achieved the target for flowlines installation and handover completion within 3 days for INFILL drilling. 2) HUC for Samarang Gas Turbine Generator (GTG) Project Manage to perform critical lifting of 1 unit base skid and new Saturn 10 Gas Turbine Generator weighing 15MT total with Workboat special entry via soft mooring at SMP-A platform and received “Best Project in SBO” award. 3) HUC for Samarang Phase 2 Redevelopment Project - Platform Upgrading, Revisit & IO Modification Introduced Integrated Operation to monitor and control between mother and satellites production via radio link with Solar Panel powered satellite platform.4) HUC for Samarang Phase 2AD Accelerated Development INFILL Drilling SMJT-G Implement new SIPROD mode system to accept INFILL drilling and performed the flowline installation and handover within 1 day time, the project considered to be “Best in Class” category. Tunjukkan kurang

    • Rotary engineering limited

      Jun 2016 - Jan 2016
      Project engineer

       Led the crews for RAPID Package 3 Area 2 E&I grounding installation, lighting and cable ladder including instrument devices installation works Site coordination with client and main con for the RFI for Megger Test and Continuity test up to ITR-A check sheet requirement. Produce Method Statement and JHA for all the required procedure and works required.  Managing manpower for daily works to site and accommodation. Produce daily progress report DPR and Weekly report as required by client Coordinate with management and workers with regards to welfare and accommodation of the direct workers. Delegating tasks between the QC Inspector and Supervisor in daily basis work to achieve progress target daily.PROJECT INVOLVEMENT & KEY POINTS:1) RAPID PACKAGE 3 E&I LIGHTING AND GROUNDING INSTALLATION Manually identify and planning ahead of schedule for the grounding systems than can be done ahead confirming that there is no obstruction with Civil excavation works and Pipe rack structure installation ongoing concurrently. Tunjukkan kurang

    • Ishi power sdn bhd

      Sept 2016 - now
      Site engineer / qc engineer

       Monitoring fabrication activity in term of quality check and daily operational issues at site. Ensure for quality requirements are followed by fabricator and keeping up the dispatch dates and priority of the consignments. Ensure that the relevant version of applicable IHI drawings & specifications are issued to Fabricator in time. Monitoring the process flow for proper sequence and required quality level as per IHI ITP’s. Conduct stage inspection with fabricator including visual inspection, welding quality, distortion and alignment requirement as per ITP issued by IHI and prepare reqquired quality documents with the fabricator. Coordinate witness inspection with Client TNB for all the ducts delivered to site for final acceptance. Manage and coordinate fabricator to attend all repair works required as per ITP and comments by clients.  Conduct internal review meetings for the progress and clarifications with the fabricator. Compile and submit the progress reports prepared by sub-contractor on daily basis and submit to the Main Office by weekly.PROJECT INVOLVEMENT & KEY POINTS:1) JIMAH EAST POWER 2 X 1000MW COAL FIRED POWER PLANT PROJECT Monitoring and managing site works including Quality Control, fabrication sequence, manpower planning including safety adherence by the fabricator on site to deliver total of 4300 MT of Ductings for the Boiler Unit 1 and Unit 2. Tunjukkan kurang

  • Licenses & Certifications

    • Bachelor degree of electrical and electronics engineering

  • Volunteer Experience

    • Comitte

      Issued by Universiti Putra Malaysia
      Universiti Putra MalaysiaAssociated with Mohd Asyraf Zainal Abidin