Bisharat Rasool Memon, PMP®

Bisharat Rasool Memon, PMP®

PCB Design Engineer

Followers of Bisharat Rasool Memon, PMP®696 followers
location of Bisharat Rasool Memon, PMP®Pakistan

Connect with Bisharat Rasool Memon, PMP® to Send Message

Connect

Connect with Bisharat Rasool Memon, PMP® to Send Message

Connect
  • Timeline

  • About me

    Design Engineer at Saudi Telecom Company

  • Education

    • Cadet College Petaro

      -
    • Mehran University of Engineering and Technology

      2000 - 2004
      B.E. Electronics

      Activities and Societies: Electronics Laboratory Demonstrator, CCNA - Won Marit Scholarship (2002, 2003) from Fuji Foundation- Dissertation titled “Tele-controlled Home Automation"

  • Experience

    • Hasan Enterprises

      May 2004 - Feb 2005
      PCB Design Engineer

      • Design Load boards and Burn-In boards• Responsible for quality assurance and timely completion of projects• Co-ordination with customer for technical details and further enhancement in projects• Conducting training and furnishing technical guidance to Trainee EngineersKnowledge of SMT/Through Hole designs, BGA/PGA/QFP etc. components and their design Working Knowledge of design software like Allegro V 14.2, P-CAD 2000/2001

    • EPTSC, An ORASCOM Company

      Mar 2005 - Jan 2008

       Operation & Maintenance of Mobilink GSM Alcatel & Motorola sites in Karachi region Coordination with MOBILINK peer for resolution of cell site issues Migration and re-parenting activities of sites from one BSC to another. Troubleshooting of Equipment based faults and configuration issues for network entities. Handling and resolving QOS KPIs related issues to keep the network in optimum condition Escalating and troubleshooting problems causing call drops, handover failures, interference Personnel and Resource Management Establishing and Managing Quality control aspects of GSM Cell sites Conducting weekly audits of the BTS and BSC sites Provide recommendations for preventive and corrective maintenance Conducting internal training programs for human skill development Show less  Co-ordination with MOBILINK OMC-R to rectify and resolve Radio and power issues O & M of Microwave radios/network with rectification of faults within stringent SLA's Hands-on experience of Motorola Horizon Macro BTS equipment Hands-on experience of NEC and STARTEX PDH Microwave equipment Installation, Troubleshooting and maintenance of power equipment such as ELTEC, ASCOM,SAFT rectifiers Handling time critical internal and external alarms of Radio Access Network. Troubleshooting and resolution of RSL, BER and Sync Loss failures Operation, troubleshooting and maintenance of Radio equipment Corrective and Preventive maintenance of BTS and BSC shelter environment Show less

      • Team Leader (Operations) Mobilink Managed Services Project

        Apr 2007 - Jan 2008
      • BSS Engineer (Operations)

        Mar 2005 - Mar 2007
    • Warid Telecom

      Jan 2008 - Jul 2014

      Responsible for managing DWDM NOC FO, BO and Field teams for delivery of DWDM networkavailability as per KPIs. Key responsibilities include: Planning and monitoring network maintenance activities. Requirement management and change management of network topology and capacity. Stakeholder Management Develop and provision operational procedures for NOC Operations NOC team management and providing technical support and training. Keeping close liaison with Vendor for hardware fault rectification. Network Monitoring and Fault Rectification in coordination with the Field Engineers Managing Client issues in coordination with NOC engineer within the agreed SLA time lines. Ensuring adequate performance of NMS servers Analyses of daily & monthly network reports and ensure optimum network performance.Accomplishments Parallel cutover of Lahore DWDM LH and Metro nodes during Lahore MSC2 Cutover project. Shifting of DWDM Hot standby NMS Server during Lahore MSC2 Cutover Project. Development and implementation of DCN design and NM visibility solution of Huawei BITS(Building Integrated Timing system) for Warid DWDM Network. Implementation of Network Resilience plan using Microwave as second layer protection forCritical OFC sections Implementation of Network optimization plan to reduce Timeslot congestion at Hub nodeswith minimum downtime Implementation of contingency plan for flood effected sites Show less Experience of working on Huawei OptiX Products (OSN 3500 and OSN 7500 Series, BWS 1600G,BITS) at NMS level Hands on experience of Navigator 6.2, Upgrade OptiX toolkit inspector and OptiX ManagerT2000 Hands on experience of Optical power meters, Optical Spectrum & data analyzers Alarms monitoring and troubleshooting in coordination with BO and field teams Escalation of Network performance issues to BO or second level support for quick resolution. Implementation of service configurations and network topology changes. Handling and processing of TTs (Trouble Tickets) from customers and ensuring the problemresolution within the agreed SLA time lines. Preparation of network reports of Warid DWDM network Preventive & corrective maintenance for NMS servers and DCN routers and theirimplementation with coordination of Back office support engineer. Show less  Project Management for RAN rollout Requirements management for timely resolution of Project issues and timely target delivery. Stakeholder Management Deployment of Micro (Indoor / Outdoor) sites and Mobile BTS Coordination with other Telecom Operators for OMO Site Sharing. Project Management of Swap and expansion of sites as per planning requirements Managing Project track record and documentation. Conducting telecom PATs Radio Access and Transmission Access Networks. Participation in RFI and PAT as per agreed specification of Macro, Micro and IBS sitesAccomplishments Project Management for RAN rollout for Network expansion of Warid Telecom in SouthernPakistan Project Management of first GSM Solar Site Project as part of Warid GOING GREEN Initiative Project Management of VTDC Project as part of OPEX saving initiative Show less

      • Sr. Executive DWDM NOC

        Jan 2012 - Jul 2014
      • Executive Engineer, DWDM NOC, Network Operations & Quality

        Jul 2009 - Dec 2011
      • Executive Engineer, RAN Projects, Network Rollout

        Jan 2008 - Jun 2009
    • Stc

      Aug 2014 - now
      Design Engineer
  • Licenses & Certifications

    • Project Management Professional (PMP)

      Project Management Institute, Inc.