
Kevin Arakal
Kintana Admin

Connect with Kevin Arakal to Send Message
Connect
Connect with Kevin Arakal to Send Message
ConnectTimeline
About me
Data Analyst at AIB (Allied Irish Banks) Ireland
Education

Bharathidasan University
1998 - 2001Master of Computer Applications - MCA Computer Applications FirstActivities and Societies: Computer Applications Computer Applications

Jayaram College of Engineering and Technology
-Master of Computer Applications (M.C.A.) Computer Science
Experience

Washington Mutual Card Services
Jun 2005 - Jul 2006Kintana AdminKintana is an enterprise management tool for managing IT related functions. In Providian perspective we are using Kintana for managing all the demands (Requests), projects and also the time that a resource worked. It provides step by step process required to complete a project and update the status of the task. Kintana project Manager provides increased visibility for all participants with consideration of the level of complexity required for their job responsibilities. It enables to develop the organization and improve its effectiveness and quality of work under a Centralized Management. Kintana provides all users a complete, real time, overall initiatives in the enterprise at various levels of summarization or detail. Along with built-in reports Kintana also provides options for creating customized reports. Show less

Wipro Technologies
Jul 2006 - nowData Analyst
Oct 2017 - nowTeam Lead
Jul 2006 - now

Dun and Bradstreet
Jul 2006 - May 2008Senior Software EngineerIQ data mart is the Heart of Management Reporting System. This warehouse database (Sybase) contains about 90% of reporting data. Reports generated from these data are used by teams across D&B for Financial planning /analysis /forecasting. Transactions from back office legacy system (BOLT) an online transaction processing systems gets loaded into IQ database on a daily basis. IQ system is feeding many down stream applications like customer knowledge, grasp, OTM etc.

Toys"R"Us
Jul 2008 - Dec 2008Senior Software EngineerThe Vendor Deal Portal application enables Vendors to access the Credit Allowance related information through the Vendor Portal. It is enhanced with many new features for end users including a dashboard. The dash board associated with the VDP application is available for a set of privileged users which helps to access up to date information in various levels of summarization or detail.

NATIONAL GRID UK LIMITED
Jan 2009 - Oct 2009ConsultantA Study was conducted as a part of iGMS Asset Health study project to look into the application components for Business Applications and provide recommendations towards improving the stability and serviceability of the system. One of the key observations of the project was the frequent failure of the Oracle streams process, used for the intra-system communication between the sub-systems of iGMS (Integrated Gas Management System). This is considered to be the transfers a huge amount of data to the MSI side through the oracle stream. A solution has been proposed and implemented as part of iGMS Asset Health for reduction of load via applying a ‘conditional rule based’ capture process of Oracle Streams. Show less

Dun & Bradstreet
Nov 2009 - Dec 2010Module LeadThe purpose of the project is to drive on-time sales renewals and build new product line for D&B while balancing Customer Satisfaction concerns. Another goal is to introduce various service termination options to increase the revenue by restricting the number of customers receives D&B services beyond contract expiration without signing a new contract. The new product line roll-out will be coupled with the launch of a new pricing model, enabling D&B to more closely align price-to-value and optimize price realization and the new pricing model will address the problems with the current pricing model. All the existing contracts had undergone a onetime migration process, so that it will follow the new pricing model immediately after the current contract terminates. A secondary goal is to provide more transparent reporting about the customers in the bridge period. Show less

RWE Generation UK plc
Feb 2011 - Oct 2011Module LeadThe Domino program is driven by the RWE Npower Retail (“Retail”) recognition that it’s key operational and marketing data are critical assets that need to be managed effectively. An exercise was carried out within Data Services to identify best practice approaches to data management and provide recommendations towards improving the stability and serviceability of the system. As part of domino program RWE decided to migrate critical applications like Formfill, PPMS, EPPS servers from the current ‘aged’ servers to a more updated environment for improving accessibility and the performance of the system. All the migrated applications have been tested properly and submitted a detailed performance results. Show less

State Street
Feb 2012 - Nov 2013Team LeadETP application team will assist the business, end-user community and business support groups in implementing various business scenarios, also responsible for the continued integrity of the application and fulfill state street corporation’s overall strategic objectives. The ETP system will accept and process the Portfolio Composition File on a daily basis created by the ETF fund manager after the market close. The information will allow the Portfolio Management team to have visibility into the make up of the fund’s cash component number for the next business day’s estimated cash and trading. The ETP system feed various downstream system also. Reports generated from these data are used by teams across state street for planning /analysis /forecasting etc. Show less

STMicroelectronics
Jan 2013 - Apr 2014Associate ConsultantThe Enterprise Hub project encompasses the process to transform the existing Informatica MDM HUB from an analyticalapplication to an operational application, to enable Customer creation and to manage and govern the Enterprise masterdata att ributes of a customer. A new Web Application, designed to leverage the new set of services for Customercreation.A high availability infrastructure to improve response time to the requestor and to enable real time capab ilities. Theauto-create of the customer master record will drive this.• Manage the custom er master data through web application, where the user will submit a request toadd/change data. Based on completeness and accuracy of the data submitted the changes will be applied automaticallyto downstream systems. If the submitted data does not meetthe standards the request will be reviewed before updateis made to downstream systems like Oracle 11i and Propel SAP.Responsibility: A new Web Application, designed to leverage the new set of services for Customercreation.• Design Phase: Each of the requirements analyzed and different design approach was presented. The designdocuments were delivered on time.• Construction Phase: singlehandedly designed and create a work flow management system ;using oraclePL/SQL and which can be processed through IDD .written all customization code for MDM using PL/SQL .Provide necessary guidance to the team, quality review was conducted and necessary steps were taken on theobservations.• Testing Phase: Helped tthe testing team to create th e test cases for system and system integration testing. Reviewed test cases and test implementation plan.• Conducted weekly progress meeting with onsite team, maintained risk registrar, generate tractability matrix foreach transaction. Show less

EMC Corporation USA
Jun 2014 - Feb 2016Associate ConsultantThe Enterprise Hub project encompasses the process to transform the existing Informatica MDM HUB from an analytical application to an operational application, to enable Customer creation and to manage and govern the Enterprise master data attributes of a customer. A new Web Application, designed to leverage the new set of services for Customercreation. A high availability infrastructure to improve response time to the requestor and to enable real time capabilities. The auto-create of the customer master record will drive this.• Manage the customer master data through web application, where the user will submit a request to add/change data. Based on completeness and accuracy of the data submitted the changes will be applied automaticallyto downstream systems. If the submitted data does not meet the standards the request will be reviewed before update is made to downstream systems like Oracle 11i and Propel SAP.RESPONSIBILITIES: Design Phase: Each of the requirements analysed and different design approach was presented. The design documents were delivered on time.• Construction Phase: singlehandedly designed and create a work flow management system using oracle PL/SQL and which can be processed through IDD .written all customization code for MDM using PL/SQL .Provide necessary guidance to the team, quality review was conducted and necessary steps were taken on the observations.• Testing Phase: Helped the testing team to create the test cases for system and system integration testing. Reviewed test cases and test implementation plan.• Knowledge transfer: provide knowledge transfer to support teams in offshore and onsite. Prepared and updated all necessary KT doc and shared with the team and uploaded in the harvest. Show less

Philips Innovation Campus, Bangalore
Jan 2016 - Jul 2018Test Team LeadBPDH program aims to implement Informatica MDM as the backbone of Master DataManagement. Informatica MDM will be used by the Philips Healthtech organization for theconsolidation of data for their Business Partner (Customer ,Vendor and PTC),Finance and Product.This project will deliver:Customer A-level data maintenance (including Workflow)Cleansing / De-duplication capabilitAddress ValidationBi-directional integration with SFDCAuditing and DQ monitoringResponsiblity: Lead a team size of 10. Planning task for individuals and tracking the tasks. Provide necessary guidance to the team,Reviewed the test cases.Interacting with the business team to understand the requirements.Prepration test implementation plan.Preparation and execution testcases.support release management activities and production support activitiesConducted weekly progress meeting with onsite team, maintained risk registrar,generate tractability matrix for eachrequirement Show less

AIB (Allied Irish Banks) Ireland
Nov 2018 - Dec 2024Data AnalystData Quality Scorecards are built to provide metrics (Completeness, Consistency, Accuracy, Timeliness) on the quality of data on source systems and the EDW integrated data layer. These scorecards are reviewed by the Data Quality working group who represent the producers and consumers of data across AIB. Any issues identified via the scorecards are discussed with the Data Business Partners at the Data Quality Working Group and reported to the Data Quality & Governance Forum as required. The Existing Data Quality platform is being decommissioned by the end of FY2019. All capabilities, reports, profiles and scorecards will now be hosted on new Qlikview platform. The DQ team will ensure that all key functionality is replicated in the new platforms and providing support throughout the migration.RESPONSIBILITIES: Meet the customers to understand the requirements, gather and document requirements, ensure to meet customer expectations.Identify the existing IDQ Mappings/Maplets ,understand the business logic , prepare the requirement document get it reviewed and share team for migration.Enhancements, maintenance and production support of the existing application.Testing and UAT cycle support.Preparation of data set (successful and failure records)Root cause analysis of failed / mismatch records Show less
Licenses & Certifications

Snowpro Core Certification
SnowflakeDec 2024
Oracle Certified Associate - Oracle 10g Database Administrator
OracleDec 2015
Recommendations

Akram alzuraiqi
General Manager at Al Hayat Military EquipmentDubai, United Arab Emirates
Md. shahriar bin nazmul
Marketing Graduated| Former CEx Intern - Next Ventures | Research Publisher | Graphic Designer | Di...Dhaka, Bangladesh
Stephanie nelson
VP Operations at Hexos IPFolsom, California, United States
Yessenia constante
Immigration Legal Assistant interested in Gender Issues.San Antonio, Texas, United States
Liviu anuta
Site Project Manager la Tecmon Montagens Técnicas Industriais Ltda.Constanţa, Romania
Emily horrell
First Class Durham Geography Graduate with a Year AbroadExeter, England, United Kingdom
Ao thor
Arctic Advanced Project Leader & Event ManagerIslandia
Sandeep konjeti
Junior Engineer @Ness digital engineeringHyderabad, Telangana, India
Vikas singh
Estimation Engineer at HTL Aircon Pvt. Ltd.Mumbai, Maharashtra, India
Oscar chavez
Risk Compliance Manager VP at CitibanamexFaja de Oro, México, Mexico
Carolina burgos
Change Management and Cultural Transformation | Prosci® Certified Change Practitioner | Employee eng...Madrid, Community of Madrid, Spain
Andrew wilson
Site Manager at Leighs ConstructionAuckland, Auckland, New Zealand
Victor macias, pmp
Senior HR Governance Program LeaderSan Antonio, Texas, United States
Suhartini .
PPIC | Staff Administration | Warehouse StaffTangerang, Banten, Indonesia
Erin walker mph, rd, ldn
Chief Clinical DietitianKankakee, Illinois, United States
Christine bullard
Founder PICKLEBALLcations & Enchanted Rose VacationsBuford, Georgia, United States
Amal e r
Software Engineer. worked @auxzonMalappuram, Kerala, India
Eric clemens
Technology Coach at Acroment TechnologiesLakewood, Ohio, United States
Sai charitha
NIT Andhra Pradesh Computer ScienceTadepalligudem, Andhra Pradesh, India
Ontonda razwiedani
actively looking for a jobPretoria, Gauteng, South Africa
...