Nabeel Sha Navas

Nabeel sha navas

bookmark on deepenrich
location of Nabeel Sha NavasPuducherry, India
Phone number of Nabeel Sha Navas+91 xxxx xxxxx
Followers of Nabeel Sha Navas837 followers
  • Timeline

    Jan 2016 - Sept 2019

    Industrial Engineer

    Toshiba Corporation
    Oct 2020 - Jun 2022

    Project Engineer

    Bharat Electronics Limited
    Current Company
    Jun 2022 - now

    Senior Industrial Engineer

    Eaton
  • About me

    Senior Industrial Engineer at Eaton | Continuous Improvement | Industrial Engineering | Operational Excellence | Lean Manufacturing |Switchgear | Transformer | UPS |

  • Education

    • Central board of irrigation and power, new delhi

      2015 - 2016
      Post graduate diploma operation and maintenance of transmission & distribution systems 66.78%
    • Federal institute of science and technology (fisat), hormis nagar, mookannoor. p.o., angamaly, ernakulam -683 577

      2011 - 2015
      Bachelor of technology - btech electrical and electronics engineering 7.67 cgpa

      Activities and Societies: IEEE member

    • Mahatma gandhi university

      2011 - 2015
      Bachelor of technology - btech electrical and electronics engineering 7.67
    • Toc h public school

      2009 - 2011
      Higher secondary computer science 84%
  • Experience

    • Toshiba corporation

      Jan 2016 - Sept 2019
      Industrial engineer

       Designed Jigs and fixtures for the assembly to reduce lead time.  Analyse and re-engineer production layouts.  Identified bottleneck and recommended new processes to improve efficiency and reduce costs.  Identified problems and recommended new processes to improve efficiency and reduce costs.  Conducted time study using work measurement tools to validate accuracy of labor standard time.  Coached and assisted employees with adapting to new processes.  Aligned production operations to meet higher standards and maximize returns Responsible for scheduling and advising on material usage. Performed root cause analysis and implemented corrective actions as required.  Designed fixtures and jigs for process improvements.  Supervised team of 20 supervisors and co-workers in production activities. Planned preventive maintenance schedule for the of Automatic Resin Casting machine (APG) Show less

    • Bharat electronics limited

      Oct 2020 - Jun 2022
      Project engineer

       Monitoring the fiber laying activities over LT, HT and 110kV Tower across an entire district of Kerala.  Coordinating with various stakeholders like District Collector, Government departments like PWD, Water, Irrigation dept., Project Monitoring Agency, Kerala Electricity Board to get the necessary ROW permissions.  Completed milestone of the project phases like Core, Aggregation and Pre Aggregation.  Handled warehouse activities like receipt & issuance of Fiber cables & accessories for 3 districts of Kerala.  Submitting the invoices to PMA for payment approval from KSITIL.  Troubleshooting the POP's (21nos) operating in the district for any utility or network related issues.  Configure IP for End Offices (2100nos) in the districts by taking support from Network Operating Center.  Witness the Acceptance Test by the PMA for all the Links and POP's. Show less

    • Eaton

      Jun 2022 - now
      Senior industrial engineer

       Preparation of Process Flow Diagram for various products like Fuses, UPS (1 & 3 Phase) and RMU in Microsoft Visio  Review pFMEA document for all the products with cross functional team including Production, Quality, Testing, Stores etc.  Updating the layout of plant in AutoCAD for machinery, equipment’s for a total area of about 1.5Lakh Sq.Feet  Preparation of Standard Work for the assembly line with proper line balancing  Updating the Routing time in SAP for the assembly using Time Study.  Calculating the OEE of critical equipment’s monthly and reporting to APAC level.  Be a champion for Lean workshops in the factory by conducting VSM, 5S, Standard work  Calculation of Cost Out from the Kaizen Ideas implemented by the team.  Meeting the department objective of submitting the Level 1 &2 Kaizen ideas.  Successfully completed NPI projects in the UPS 93PR UPM modules by establishing the Layout, assembly stations, RM trolleys, line balancing  Managed CAPEX worth $500K for new factory 50000sq ft for civil works, utility, RM & FG stores etc. Show less

  • Licenses & Certifications

    • Electrical designing & drafting

      Sted council,kerala
      View certificate certificate
    • Hvdc grids

      Hitachi abb
      May 2022
    • Industrial sector lean certification curriculum part-1

      Eaton
      Jan 2023
  • Volunteer Experience

    • Blood Donor

      Issued by Thalassemia Center
      Thalassemia CenterAssociated with Nabeel Sha Navas