Ts.Nazrah Ilyana Sulaiman

Ts.Nazrah Ilyana Sulaiman

Junior Engineer ( Internship)

Followers of Ts.Nazrah Ilyana Sulaiman1000 followers
location of Ts.Nazrah Ilyana SulaimanFederal Territory of Kuala Lumpur, Malaysia

Connect with Ts.Nazrah Ilyana Sulaiman to Send Message

Connect

Connect with Ts.Nazrah Ilyana Sulaiman to Send Message

Connect
  • Timeline

  • About me

    P.Tech (Oil & Gas -Technology) | MIET | (Commissioning & Start Up Engineer). PhD Candidate | Researcher

  • Education

    • Universiti Tun Hussein Onn Malaysia

      2022 - 2025
      Doctor of Philosophy - PhD Electrical and Electronics Engineering Ongoing PhD by research Optical sensor
    • Universiti Tun Hussein Onn Malaysia

      2019 - 2022
      Master of Engineering - MEng Electrical and Electronics Engineering Master by research in optical devices and sensor .
    • Universiti Teknologi Malaysia

      -
      Bachelor Hons Electrical and electronic
  • Experience

    • PETRONAS

      Apr 2006 - Jun 2006
      Junior Engineer ( Internship)

      -Assisted in calculating run hours for 2 compressor and develop master plan,manpower, schedule for compressor inspection / maintenance.-Assisted with other technician to do calibration for mechanical E & I equipment during compressor shut down-Involved in pipeline inspection gauge (PIG) for cleaning and removing and dirt, dust, debris,metal objective or non metal objective for sector 1 Main loop Line from kuantan to segamat.

    • Transerve Pte Ltd

      Jun 2007 - Apr 2009
      Electrical and Instrumentation Engineer

      Project :1) Additional living quarters (Funan & Satun)2) Living Quarters and Helipad FPSO Smart 13) FPSO E & I control room 4) Demolition and Disposal F23 and F6 Living quarters and helipad Clients: 1)Chevron Thailand 2) Akers Solution 3)Petrobras America Inc & Flex Module Asia pte Ltd 4) Sarawak Shell Berhad -Review of project documents, inspection test plan, specifications, drawings and procedures. -Project Management - Planning supervision, coordinate between subcontractors and clients to ensure that the project carry out the work to contractual specifications and quality requirements. Show less

    • IMPSA Industrias Metalúrgicas Pescarmona S.A

      May 2009 - Mar 2011
      QC Engineer

      Project: Ship to Shore(STS), Rubber Tyre Gantry (RTG) Cranes and Bakun hydroelectric Client: Pelabuhan Tanjung Pelepas, Bintulu Port and malaysia Government -Fabricate,installations and commissions cranes and hydroelectric project. -Perform FAT, SAT to verify construction as per clients specifications and quality control standard such as per IEC, BS and technical specifications.-Perform DOSH and Endurance test at Port or site.

    • Mensilin holdings sdn bhd

      Apr 2011 - May 2012
      Electrical & Instrument Engineer

      Project :Biomass Power Plant Client: Johor Corporation (JCorp) -Fabricate,installations and Set Up biomass plant operation. -Perform SAT for MCC to verify construction as per clients specifications and quality control standard such as per IEC, BS and technical specifications.-Organize and implement preventive maintenance scheduling for short and long term basic for E & I section

    • Malaysia Marine & Heavy Engineering

      May 2012 - now

      Kasawari Gas Development ProjectDuties and Responsibilities:1. Report to Lead and Commissioning & HUC Manager2. Review project specifications, drawings, contract requirement, EDMS and vendor’s data for preparation of procedures and job execution during pre and commissioning activities.3. Participate in the Technical Bid Evaluation , technical clarification and tender appraisal on Instrument and telecom package.4.Coordinate with Construction focal points and/or planner or scheduler to ensure timely completion of other activities prior to commencement of Onshore Testing & Commissioning activities.5.Directly involved with site testing pre-commissioning & commissioning (onshore & offshore) activities with subcontractors, vendors and client as per job scope and technical specifications. 6.Coordinate, supervise and ensure instrument and telecom Factory Acceptance Test (FAT), SAT, commissioning activities including loop check, mechanical skid, Cause & Effect checking activities adhere to contract, drawings & specifications, codes & standards and Vendor recommendations.7.Prepare and develop vendor mobilisation onshore and offshore .8. Prepare and responsible for sending electronic copy of various report such as FAT, SAT procedure and MDR, to project team and clients. Show less Project : EPCIC of BOKOR Redevelopment Phase 3 Project EOR (BOCPP-A) - Petronas.Mechanical Completion & Commissioning Engineer-Participate in the Technical Bid Evaluation , technical clarification and tender appraisal on Instrument and mechanical package.-Review specifications, drawings, contract requirements and vendor’s data for preparation of procedures.-To drive construction and commissioning team to follow sequence system to be completed as per skyline and schedules.-To ensure all carry over works,hook up,commissioning and Start UP executed in accordance with the project objective. Show less Project: EPCC Malikai Deepwater TLP Client: TMJV with Sabah Shell PetroleumPreparation of change order submission to clients( TMJV & SSPC).To prepare and asists claims to TMJV & SSPCsuch as schedule assurance claim which includes compilation of supporting details and evidence).Closing of Service Order with various project such as Malikai & Baronia subcontractors which includes verification of final contract value and greeting agreement with subcontractors for the closure of subcontract.Re-measurement of Malikai mechanical works submission to TMJV.Preparation of variation order to subcontractor which includes verification of subcontractor VO submission and validity of claims and etc.Subcontractor progress claim approval (CPC) includes verification of claims value and verified supporting documents. Show less Project: EPCC Malikai Deepwater TLP Client: TMJV with Sabah Shell Petroleum -To drive construction and commissions team to follow sequence sub system to be completed as per float off,load out and Ready for start Up ( RFSA) schedules.-To ensure all mechanical completion tag numbers ,commissioning and Start UP activities executed in accordance with the project objective.To ensure all punch list close in order to issue Discipline Acceptance certificate (DAC). To develop field defect report database for monitoring activities and liaise with subcontractors, project team,Qc, and engineering to ensure findings to be captured and close. Show less

      • Commissioning and Start -Up Engineer( Instrument & Telecom)

        Apr 2021 - now
      • Mechanical completion (Instrument & Telecom)

        Jan 2018 - Apr 2021
      • Seconded as Contract Admin and Cost Control

        Feb 2017 - Jul 2018
      • Mechanical completion and turnover engineer

        Jan 2016 - Jan 2017
      • Work pack engineer

        Jan 2015 - Jul 2016
      • Mechanical Completion and Turnover Engineer

        May 2012 - Jul 2016
  • Licenses & Certifications

    • MBOT

      Professional Technologist
      Aug 2023
    • MSTS ASIA (T-BOSIET)

      OPITO T-BOSIET
      Feb 2020
    • The Institution of Engineers Malaysia

      IEM Malaysia
      Feb 2013
    • MIET

      Institution of Engineering and Technology (IET)
      Jan 2025
    • Basic Offshore Safety Induction& Emergency Training and Travel Safely by Boat (BOSEIT)

      OPITO
      Sept 2023
    • Certified Graduate Engineer

      Board of Engineers Malaysia
      Feb 2013