
Timeline
About me
Project Design Engineer | Energy | Gas Transmission | Oil Terminal | Piping | Pipe Stress Analysis | Hydraulic Analysis
Education

M. r. k polytechnic
2009 - 2012Diploma mechanical engineering
Jawaharlal nehru technological university, kakinada
2012 - 2015Bachelor's degree mechanical engineering
Teesside university
2020 - 2022Master's degree mechanical engineering• Machine Design• Finite Element Methods• CAD/CAM and Product Developments• Supply Chain Management• Manufacturing Systems• Advanced Practice in Science, Engineering and Design• Research and Enterprise• Engineering Research Project in Experimental Investigation on Performance Characteristics of Single Cylinder SI engine with Bioethanol Blended Fuels.
Experience

Techno weld industrial works
May 2011 - Nov 2011Engineering trainee1. Completed industrial training in M/s Techno Weld industrial Works for six months during my final year of Diploma.2. Training involved in inspection and execution of manufacturing of High-Pressure vessels, Buffer Vessels Heat exchangers, Deaerator heaters and SS Storage tanks.3. Assisting Quality engineer in preparing inspection reports and inspection of materials, welding joints, Non-destructive testing, Hydro test, and final inspection of vessels.

Techno weld industrial works
Aug 2015 - Apr 2017Mechanical engineer1. Study of Mechanical GA s, Fabricated GA’ and Quality documents to understand the work involved and passing the information to Manufacturing Crew for further process. 2. Study of Quality Assurance Plan (QAP), Welding procedure specification (WPS) and implementation of the same while manufacturing to get quality product as per referred standards. 3. Carried out inward inspections & verifications of material & equipment to ensure conformance to data sheets, job specifications & standards 4. Preparation of Final dimension report, Materials data report, RT completion report, UT report, HT Report & Job completion report.5. Co-ordination of all Non-destructive tests and preparing the final data sheets.6. Inspection of hydro tests & pneumatic tests. Show less

Artson engineering limited
Apr 2017 - Jun 20191. Preparation and implementation of Project Execution Plan (PEP) and Maintaining project documents for Preparation of Control Budget, billing schedule, and maintaining cash flow statements. 2. Preparing specifications for procurement, material/purchase requisition, purchase order and providing approvals for vendor QAP & Drawings.3. Monitors work in progress and prepare weekly/monthly report along with S-Curves of the status of each assignment.4. Review of engineering deliverables with reference to specification/standards and preparation of technical evaluation reports of vendors.5. Ensuring all procedures and calculations are submitted to the client for review and approval.6. Coordinated materials and assists in the logistics, its shipment and receipt at construction site.7. Coordinated with all projects related personnel on day-today progress of work activities, procurement, and operations to ensure timely completion of the project. Show less 1. Preparing all project Quality related Procedures, QAP, ITP, WPS, PQR and WQT as per related standards (ASME Sec. IX, ASME Sec. VIII, ASME Sec. V, ASME Sec. II C, API 650 and API 1104).2. Ensuring work schedule by doing manpower plan & Machinery Plan.3. Incoming material inspection and Stage wise Inspection of tankage, structural and pipeline fabrication as per approved drawings.4. Ensure quality of work in line with project QA/QC documents and monitoring welding to avoid defects obtained while welding joints with the help of Radiography film interpretation. 5. Preparing step-by-step inspection reports and Monitor Work in Progress and update the issues if any, to avoid delay in project.6. Carried out Pre-commissioning activities for aviation fuel pipeline like Hydro test, Swabbing, Vacuum De-Humidification and Nitrogen Purging. Show less
Mechanical Engineer - Projects
Jun 2018 - Jun 2019Mechanical Engineer - QA/QC
Apr 2017 - Jun 2018

Thermosystems private limited
Jun 2019 - Dec 2019Senior mechanical engineer - projects1. Review of tender requirements, Client Specifications, and scope of work to be done for the Project. 2. Preparation of L2 & L3 Schedules and work procedures required for project execution.3. Preparation of BBU for supply and erection activities & Submission of Engineering drawings, FQP and WPS to customer.4. Preparing Indents for BOI’s & Vetting of Vendor QAP’S and responsible for timely Supply of material to the site.5. Follow up on progress & quality of work at site on regular basis.6. Handling & resolving any unexpected technical difficulties & other problems which arise at site. Show less

Fingleton white
Mar 2022 - nowProject Design Engineer
Sept 2023 - nowMechanical Design Engineer
Mar 2022 - Sept 2023
Licenses & Certifications
- View certificate

Project management professional (pmp)®
Project management instituteJan 2024
Recommendations

Neeraj quadras
Enterprising, Decisive, Operations Professional.San Jose, California, United States
Sarah hornschuh
Marketing Manager at CFA Society GermanyFrankfurt Rhine-Main Metropolitan Area
Hilda osumade, acipm
Organization Development | Talent Management & Development | Performance Management | HR Business Pa...Lagos State, Nigeria
Katy chemkhi
People Operations Manager at Aesto HealthBirmingham, Alabama, United States
Ibrahim almadhi
Chemicals Strategy | Investments Enablement | Circular EconomyRiyadh, Saudi Arabia
Louisa m.o. turkson
Human Resource ManagerToronto, Ontario, Canada
Jamshid yerzakov
CEO @ Proxima - making the software reliableTashkent, Uzbekistan
Lebogang letsholo
Director at Encore Live Entertainment group Pty Ltd.Johannesburg Metropolitan Area
严勇
IoT Project Manager at ThyssenKruppShanghai, China
Deniz topal
Urban Plannerİzmir, Türkiye
...