Sherif Morsy, PMP, PMI-RMP, PMI-SP

Sherif morsy, pmp, pmi-rmp, pmi-sp

bookmark on deepenrich
location of Sherif Morsy, PMP, PMI-RMP, PMI-SP6th of October, Al Jizah, Egypt
Followers of Sherif Morsy, PMP, PMI-RMP, PMI-SP1000 followers
  • Timeline

  • About me

    Project Controls Engineer at Hill International, Inc.

  • Education

    • Alexandria university

      2012 - 2017
      Bachelor of engineering construction engineering
  • Experience

    • Engineering consultants group s.a.

      Jan 2013 - Jan 2016
      Trainee

      King Abdullah Economic City- Al Waha Project;For 3 months duration, during each year from 2013 and till 2016, Training on:-Site Inspections for various construction works.-Studying design drawings and work shop drawings. -Understanding Building Construction Work sequence and scheduling it on Primavera.-Co-ordination with different disciplines.-Understanding and studying all project documents.-Taking the project as a case study for doing the graduation project and comparing it to the factual project as follows:a- Doing a full quantity surveying for the project manually (excel) and preparing a full take off on revit after modelling the project structurally and architecturally, and comparing the product.b- Doing a full cost estimation and pricing for the project.c- Re-itemizing and finalizing the project BOQd- Cost break down for each item in the BOQ into material, labor and equipment costse- preparing and developing a cash in and cash out for the project, after calculating direct and indirect cost and profit margins.d- Preparing and finalizing the project scope of work and developing all work packages.e- Dividing project packages into work activities to finalize the activity list.f- Estimating production rates and durations for each activity based on the calculated quantities. g- Loading of all work activities and scheduling it on P6 within the contractual milestones and the project time frame. h- Resources and cost loading for each work activity on P6.i- Doing a case study for resource levelling and allocation.j- Review, check and adjust the equivalency of the project BOQ and P6 cost loaded.k- Maintaining, assigning and updating the project baseline based on a factual data on a certain cut of date.l- Comparing the updated and baseline programs using earned value techniques and see the variance.m- Preparing and developing a project dashboard. n- Preparing and finalizing the graduation project Report. Show less

    • Engineering consultants group s.a.

      Nov 2017 - Apr 2019
      Planning engineer

      Alamein Towers in Alamein New CityProject Brief:-The project is subdivided into seven zones are constructed by the following Contractors: Hassan Allam & CCC Joint Venture, Orascom, Dorra, Redcon, Siac, Arab Contractors, Samco.Project Description:-The project consists of (15) mixed uses towers (Garages, Commercial and Residential), ranging from 100 to 160 meters height, to be constructed on 3-storey Podiums with total area: 688,092 m2 and estimated budget 38 billion EGP. Tasks and responsibilities:1-Review and approval of contractors submitted baseline schedules.2-Preparing & finalizing daily, weekly and monthly reports for the Client purposes.3-Review and approval of daily, weekly and monthly contractors reports.4-Leading the contractors to resubmit and finalize more appropriate schedules in very difficult situations.5-Preparing special reports and dashboards for top management.6-Preparing and finalizing weekly presentations for the client, to be presented during site visits by the Minister of Housing.7-Reviewing Contractors’ updated schedules on a monthly basis for monitoring, controlling and tracking the projects.8-Evaluation and reporting the performance of the contractors.9-Developing a roughly estimated weighting system for monitoring the project in a simple way and measuring its progress.10-Monitoring site works and recording delays (Actual % versus Planned %).11-Preparing a high level master schedule at the early stage of the projects.12-Preparing a detailed work progress sheets contractors. 13-Doing a weekly inspection on site for taking factual records, assuring achievement of the targeted plan and monitoring sequencing of work activities on site.14-Attending weekly progress meetings with contractors for discussing the work progress status (planned versus actuals), delayed activities, mitigation and targeted plans, etc.,15-Giving support/ recommendation on site regarding issues concerning contractual & program letters replying. Show less

    • Hill international, inc.

      May 2021 - now

      1- ADTIC (3) projects: Movenpick, Sharm: Full Renovation.Mercure, Hurghada: Full Renovation.Mercure Sphinx: New Construction Building.2- Shepherd, Cairo Project: Full Renovation & new construction packages.Mena House Palace Renovation Project;Project Description : Renovation of Mena House Palace Hotel (JW Marriott) which is uniquely facing the pyramids of Giza, it consists of 10 Floor levels for the Palace (public areas, 16 Suites and 65 Guestrooms) and landscape & infrastructure. Show less 1- ADTIC (3) projects: Movenpick, Sharm: Full Renovation.Mercure, Hurghada: Full Renovation.Mercure Sphinx: New Construction Building.2- Shepherd, Cairo Project: Full Renovation & new construction packages.Responsibilities/ Tasks:• Developing and finalizing detailed master schedule/ tender schedule for the projects.• Bidders/ contractors tender schedules evaluation/ assessment throughout settled criteria weighted points.• Updating the detailed master schedule/ tender schedule for the projects.• Preparing revised & recovery schedules for the detailed master schedules upon the data availability/ scope & strategy changes/ delay mitigation, etc..).• Highlighting and explaining the schedule slippage and cause of delays for the projects and recommending the way it could be mitigated.• Preparing and finalizing monthly reports for the projects.• Preparing and finalizing projects packaging strategies proposals for obtaining client approval.• review and approval of contractors baseline schedules for running packages activities (structure PKG, kitchen PKG, MUR PKG, water treatment plants PKG, etc..).• Tracking & monitoring running packages throughout the Contractors updated schedule after complete analysis & review.• Review & analyzing of contractors submitted EOT claims, and submitting narrative to client for obtaining approvals.• Establishing & developing monthly presentations to client top management. Show less Mena House Palace Renovation Project;Project Description : Renovation of Mena House Palace Hotel (JW Marriott) which is uniquely facing the pyramids of Giza, it consists of 10 Floor levels for the Palace (public areas, 16 Suites and 65 Guestrooms) and landscape & infrastructure. Responsibilities/ Tasks:• Review and approval of contractors submitted/ revised baseline schedules.• Preparing & finalizing monthly and weekly reports for the client purposes.• Preparing & finalizing internal monthly executive reports for top management.• Review and comment on weekly and monthly contractor s' reports.• Reviewing contractors’’ updated schedules on a monthly basis for monitoring and tracking the projects.• Evaluation and reporting the performance of the contractors.• Developing and finalizing detailed master schedule for the project to track the contractual milestones and to implement the project scope in brief activities and get the client fully aware with project time frame.• Updating the project master schedule on monthly basis to measure the project status on time perspective.• Monitoring site works and recording delays (Actual VS planned %).• Delay analysis and preparing supporting documents for defending cases.• Preparing work progress meetings with contractor for discussing work progress status of the project.• Preparing and finalizing internal monthly presentation for top management.• Preparing and finalizing monthly pictorial reports for top management.• Preparing and finalizing monthly dashboard for top management.• Preparing and developing work progress sheets for construction, material/ procurement and shop drawings for measuring and tracking progress.• Giving support/ recommendation on site regarding issues concerning the project contracts/ contractual & program letters replying. Show less Jul 2022 - Oct 2022Cairo Monorail Project: West of Nile LineTasks and responsibilities:• Developing & adjusting the PM reporting system & creating a solid database for monitoring & tracking the project.• Creating & developing a progress measurement system for calculating the detailed & overall progress %. • Preparing & developing weekly & monthly presentations for the top management & ministry of transportation. • Attending work progress meetings with governmental authorities for discussing the project progress status. • Preparing & finalizing the daily, weekly & monthly progress reports to be issued to client.• Preparing & Issuance of letters to contractor on monthly basis concerning contractor's productivity & delays. • Reviewing & analyzing of contractor revised schedules & weekly/ monthly progess reports. Show less Forge Project:All SODIC projects (SODIC west, east & north projects in Egypt)Job tasks & responsibilities:• Review & analyzing projects schedules/ progress reports/ presentations/ data worksheets received from client.• Preparing & developing of dashboard for each project.• Adding data related to schedule in the risk register including probability, impact & proposed risk responses.• Working on the assessment/ evaluation report concerning the data related to the baselines/ updated schedules/ delays/ mitigation plans.• Establishing & developing P6 cost loading & cash flow of activities per each program/ project related to the west area which is nearly 85% of the total SODIC projects, and that after receiving & verifying cost data from the cost department. Show less

      • Project Controls Engineer

        Jan 2023 - now
      • Planning Engineer

        Apr 2021 - Dec 2022
      • Planning Engineer

        Sept 2019 - Dec 2022
      • Planning Engineer

        Jul 2022 - Nov 2022
      • Planning Engineer

        May 2021 - Jul 2021
  • Licenses & Certifications

    • Claims management, extension of time (eot) and delays analysis

      Planning engineer est.
      Jun 2022
    • Pmi risk management professional (pmi-rmp)

      Project management institute
      Mar 2022
    • Cost control for construction projects

      Planning engineer est.
      Jul 2022
    • Project management professional (pmp)

      Project management institute
      Feb 2022
    • Pmi scheduling professional (pmi-sp)

      Project management institute
      Aug 2023
    • Power bi monitoring and controlling with p6

      Planning engineer
      Dec 2022