Viraj Doshi

Viraj Doshi

Manufacturing Engineering Intern

Followers of Viraj Doshi1000 followers
location of Viraj DoshiDallas-Fort Worth Metroplex

Connect with Viraj Doshi to Send Message

Connect

Connect with Viraj Doshi to Send Message

Connect
  • Timeline

  • About me

    Program Manager III at Amazon

  • Education

    • Sadar Patel Institute Of Technology

      2010 - 2014
      Bachelor of Engineering (B.E.) Electrical and Electronics Engineering First Class
    • The University of Texas at Arlington

      2014 - 2016
      Master's degree Industrial Engineering 3.59
    • Campbellsville University

      2019 - 2021
      Master of Business Administration - MBA Global Business Management
  • Experience

    • Alcrome Technologies India Pvt. Ltd.

      Jun 2011 - Jun 2012
      Manufacturing Engineering Intern

      • Reduced material flow by 20% by redesigning shop floor using AutoCAD.• Created Pictorial Work Instruction Document (SOP) for workstations to reduce heavy labor turnover ratio.• Generated non-conforming reports (NCRs) and facilitated processing of NCRs in a timely manner.

    • Worldwide Oilfield Machine

      May 2015 - Aug 2015
      Industrial Engineer Intern

      • Determined the quality fallouts in the choke control console assembly.• Identified major quality problems in the system, by incorporating Pareto analysis to focus on higher fall outs.• Analyzed the defects by brainstorming tool such as fish bone diagram and 5 why analysis.• Corrective action (CA) on root cause was implemented and validated by statistical significance.• Documented SOP, FAT, Gauge calibration and operator training was undertaken in compliance ISO 9001 and API 16C standards as preventive action (PA).• Assisted in Data migration from EXCEL to Enterprise Resource Planning (ERP) system. • Performed inventory management activities for consoles using “Syteline” Enterprise Resource Planning system.• Participated and documented design file for API 16C audit. Show less

    • Modak Solutions LLC

      Aug 2016 - Dec 2016
      Operations Intern

      • Developed SOP for Field engineers for installation and Un-installation of FCC approved Warning Signs.• Running Simulations to find, the coverage based on the statistical data generated on “Roofview” tool.• Reduced the time for generating report from 120 mins to 45 mins.• Liaison between client and company.

    • Johnson & Johnson

      Jan 2017 - Jun 2021

      • Designed, developed, and validated (IQ, OQ, PQ) Laser Marking equipment with OCR Vision System for Class III medical devices along with integration with Wonderware and MES.• Created documents for FDA and BSI submissions. • Reduced Quantity discrepancy NCR’s by designing a custom solution using Mettler Toledo Industrial Counting Scale along with integration with T-wedge software and MES. • Validated an automated environmental monitoring system (EMS) replacing the manual chart recording system.• Reduced Preventative Maintenance (PM) downtime from 27 days to 14 days annually for the largest silicon spray system using Lean and Project Management principles resulting in extra capacity of 25000 units and overall relief of $450,000.• Improvised air flow inside spray booths by designing optimal exhaust system resulting in 1% yield improvement and cost savings of $80,000 annually. • Improved Spray Systems OOE from 59% to 71% resulting in daily output increment from 1700 units to 2300 units. • Optimized PM plans and PM frequency for 3 silicon spray systems resulting in 12% reduction of maintenance workload.• Project lead for Implementing end to end KRONOS 6.3 (Timecard approving system) sitewide. Show less • 2nd shift Supervisor managing 55 employees on 6 assembly lines and 4 packaging lines producing over 600K units of class III medical device products. Responsible for daily operations, safety, quality, maintenance, cleaning, training, and leading continuous improvement throughout the site. • Constantly delivered required manufacturing production outputs per shift during night rotation by managing and balancing operators as per Customer requirements.• Ensured maximum associate efficiency and utilization through regular frequent updating of staffing models. • Fostered improvement of cross training and flexibility of all production associates. • Initiate process improvement plans and corrective actions to improve overall quality performance, alleviate area defects and reduce scrap and rework costs. • Performed employee’s performance evaluation and year end compensation.• Performed detailed analysis for Supplies budget and assisted in 2019 Business Planning (BP). • Project member for designing and implementing One Piece Flow Gel Product Assembly Line which resulted in increasing the output by 13%. • Designed and created WIP priority tool for Main Assembly and Packaging area. • Performed capacity analysis plantwide and identified bottleneck operations for increasing volume demands.• Created KPI: productivity per operator per hour which resulted in identifying low performers and helped in improving operator efficiency by 8% for packaging lines. • Timely executed CAPA Action Items, Non-Conformance actions and investigations.• Complied with and enforced all regulatory requirements and company policies/procedures. (QSR, EHS, Standard of behaviors) Show less • Performed time studies, Capacity analysis, line balancing, labor count analysis for 7 product families.• Analyzed the routings on JD Edwards vs the actual and updated BOM’s and Routers for 2 product families. • Redesigned the floor layout for 2 assembly lines for Class III Medical device in Clean Room Environment (CME) which resulted in reduction of Material Transportation by 70%, reduced 2 head counts across two shifts, reduced cycle time by 14% and floor savings by 12% (Project Lead: JJPS Phase 2).• Designed and Implemented 6S Audit program for providing process improvement recommendations. • Executed projects in collaboration with Engineering, Facilities, Quality, Technical Services, Safety, Microbiology and Finance departments. • Created training Manual for Six Sigma Yellow and Orange belt and trained 30 Associates.• Developed a process to utilize scrap samples for Marketing purpose which resulted in a cost improvement (CIP) savings of $100,000 annually. Show less

      • Senior Manufacturing Engineer

        Mar 2019 - Jun 2021
      • Manufacturing Supervisor

        Mar 2018 - Feb 2021
      • Industrial Engineer

        Jan 2017 - Feb 2018
    • Amazon Fulfillment Technologies & Robotics

      Jun 2021 - now
      • Program Manager III

        Jan 2025 - now
      • Senior Process Engineer

        Apr 2024 - now
      • Engineering Project Manager

        Jun 2021 - May 2024
  • Licenses & Certifications

    • Continuous Improvement Tools

      Udemy
      May 2016
    • E-Commerce and Selling Online

      Alison - Free Online Learning
      View certificate certificate
    • OSHA10

      OSHA Safety Training Institute
      Jul 2021
    • ISO 9001 QMS Auditor/ Lead Auditor

      Udemy
    • Lean Six Sigma Green Belt

      KPMG India