
Timeline
About me
Gas Turbine Technician
Education

Malaysian institute of aviation technology
2012 - 2015Bachelor’s degree aircraft maintenance technology/technician
Experience

Spirit aerosystems
Aug 2015 - Dec 2015Quality trainee
Dviation group
May 2016 - Dec 2016Base maintainanceVendor at Sepang Aircraft Engineering (SAE)

Ge aviation
Jan 2017 - Dec 2019Test cell technicianDepartment Test CellResponsibilities:• Performed engine preparation and de-preparation of CFM56 and LEAP engine series for testing 1. Performed Pre-test inspection on the engine. 2. Inspection and installation of engine cowling, temperature and pressure probes and bellmouth. 3. Performed engine wash as per work instruction. 4. Assist engine testing of CFM56 and LEAP engine series. 5. Performed troubleshooting of CFM56 and LEAP engine series during testing 6. Removal of engine cowling, temperature and pressure probes and bellmouth.• Performed module (Core, LPT and Fan Case) installation and removal of CFM56 engine series.• Performed installation and removal external parts of CFM56 engine series.• Performed parts disposition after removal of CFM engine series • Performed shop clearance of CFM56 engine series before testing• Utilized precision instrument and equipment to check serviceability of test cells and engine components. Show less

Rolls-royce
Jan 2020 - Jun 2020Engine assembly technicianEngine Assembly Horizontal BuildResponsibilities:• Carry out routine maintenance checks and preventative maintenance programs • Performed major assemblies and critical assemblies of Rolls-Royce Trent 7000 and Trent 1000-TEN according to authorized approve data. 1. Performed engine marry Core and Fan case. 2. Inspection and installation of A Frame and Wingbib. 3. Inspection and installation of Toss Harness, Speed Probe and Fire Detector. 4. Inspection and installation of Low-Pressure Shaft (Set and Lock) 5. Inspection and installation of Radial Drive Shaft (RDS) 6. Inspection and installation of Upper Splitter and Lower Splitter. 7. Inspection, Set and installation of Fan track Bore. 8. Inspection and installation of Fan (Module 01) into Fan case 9. Inspection and installation of Nose Cone and Nose Cone Fairing. 10. Inspection and installation of Core Fairing. 11. Inspection and installation of Mi Cable Harness and Bracket. 12. Performed snag rectification.• Work on self inspection tasks in adherence to work instructions• Utilize precision instrument and equipment to check serviceability of the component. Show less

Pratt & whitney canada
Oct 2022 - nowSenior technician-Performed disassemble turbo machinery and RGB for PW100 series in for Repair, HSI and Overhaul according to workscope-Performed de-blading for LP disk, PT disk and HP disk -Performed Total Preventive Maintenance (TPM) checklist before execute the Task-Visual Inspect in unclean condition for any damage parts
Licenses & Certifications

License to operate in civil aerospace operations
Rolls-royceFeb 2020
Certificate of registration of engineering technologist
Board of engineers malaysiaAug 2017
Recommendations

Rashad abdelhadi, pmp®
Technical Engineer at Group AMANADubai, United Arab Emirates
Brenda s.y. c., ihrp-cp
Account Management | Customer Success | Service and Process Improvement | Project Management & Imple...Singapore
Antoinette mcneary-garvin
Clinical Research Nurse MSN, NP-C, CCRPSolano County, California, United States
Hasnain hossen
Motion DesignerDhaka, Bangladesh
Michael hendon
Chief Operations Officer at HENDON CONSULTINGAmericus, Georgia, United States
Adnan tariq
Manager Production / Operations / Projects / Utilities ( Bs Mechanical Engineer / Ms Industrial Mana...Lahore District, Punjab, Pakistan
Kim mc rahebi, mph, cph
1 Corinthians 13:6 ✝️ Health • Wellness • Science • SustainabilityDallas-Fort Worth Metroplex
Hai t.m. nguyen
Graduate student at University of UlsanSouth Korea
Judith winkler
Project Lead Internal ProjectsDresden und Umgebung
Ignatius obinwa
HEAD CHEF/ RESTAURANT MANAGERLagos State, Nigeria
...