Hai Huang

Hai Huang

Management Trainee

Followers of Hai Huang68 followers
location of Hai HuangDaxing District, Beijing, China

Connect with Hai Huang to Send Message

Connect

Connect with Hai Huang to Send Message

Connect
  • Timeline

  • About me

    Project manager

  • Education

    • 江南大学

      2007 - 2011
      学士 工业工程

      Activities and Societies: 校记者团, 学生会对外联络部, 露营俱乐部 学生会对外联络部成员,校记者团记者

    • Jiangnan University

      2007 - 2011
      学士学位 管理科学与工程-工业工程

      Activities and Societies: 辩论小组, 中小企业论坛, 校运动会 全日制四年本科,工业工程专业, 主修工业工程,机械设计, 经济学, 会计学, 英语CET-6, 多次拿到校奖学金。 参加学生会,记者团, 得到过优秀班干部称号。

    • Jiangnan University

      2007 - 2011
      Bachelor’s Degree Industrial Engineering
  • Experience

    • Avery Dennison

      Jul 2011 - Jul 2013
      Management Trainee

      2011.3~2011.11 Lean department [Coordinator] -8 wastes hunter: packing material saving $14,000/year. -SMED project: Flexo setup time from 1H to 40 min. -Kaizen: Ink tank washing improvement, total moving waste reduced 30% -TPM leader: TPM tags system establishment and removing plan execution -VSM map establisher: Make VSM map, waste finding and elimination -FMEA leader: Complaints reduce 20% by using the tool and push using in the plant -Problem solving leader: Pull system to solve consolidation order deliver on time -Layout improvement: packing consolidation, Reduce 5 positions -Automation project: Packing automation, reduce 10 positions 2011.12~2012.6 Heat transfer label line [Production Supervisor] subordinate: 30 -Safety leader: 0 safety issue -Quality responsiblility: Oven control chart to improve heat transfer label quality -Service level responsibility: cooperate with customer service team to improve deliver cycle time and quality, kaizen in process for better customer satisfaction -Cost management: scrap from 19% to 13% by using cheap setup paper -Motivate colleagues: Right person for right position, improve operator satisfaction and performance -Development subordinates: Promote 3 associates2012.7~2013.7 Lean department [Project leader] -Kaizen&project: Die cutting shelf, efficiency improves 66.7%. -Quality improvement: Offset mix reduction, complaints reduce 5/mon -Cost management: 37 saving projects tracking for North China Show less

    • Mars food

      Jul 2013 - Jun 2016
      Shift Manager

      2013.7~2015.4 Senior continuous improvement engineer -Automation project: Packing automation, reduce 6 positions -SOP management: SOP establish, training and execution tracking -Key parameters management: SRC visualization and daily audit -Problem solving specialist: FMEA find 21 risks, removed them -Communication coodinator: Upgrading and solving chronic problem and resource consolidation -Trainer qualified: Mars certificated trainer2015.5~2018.6 Promoted as Production shift manager; Subordinate: 25  -Health & Safety management: 0 injury -Food Safety responsibility: Establish and push GMP FIP to ensure food safety -Service level improvement: Flexible production to ensure deliver cycle time when order size becoming smaller and smaller -Problem solving specialist: M&M’s surface dirty reduction by benchmark  -Conflict Management: Overtime conflict dealing with, multi-skill -KPI responsibility: Responsible for shifts’ all KPI -Gallup leader: Gallup analysis and improvement -High performance Team building: Motivate and development Show less

    • Schneider Electric

      Jun 2016 - now
      Project Manager

      A) Manage and lead projects based on Final distribution portfolio following 5 main tasks: Initiate, Plan, Execute, Monitor & Control, Close. lead 7 projects like production line transfer between two countries, new products launch etc. B) Ensure the realization of the project in time, in budget scope, cost and in quality. C) Study industrial feasibility and support management team for project priority and opening decision. D) Ensure functional management with appointed project team members, and define the need of resources and skill/competency.E) Conduct FBX RE/LE project, saving:1450 K RMB/Year.F) Conduct rotary handle production line transfer from Thailand to China.G) Conduct 185 K3 parts supplier transfer project.H) Conduct EON products transfer from Germany to China, saving is 5532 KRMB/YI) Conduct QR code project, QR code is the enabler of Digital Service through Partners, the total saving is 8140 KRMB for the following 5 years, the project deliver on time, the scope include 36 production lines.J) Conduct Laser marking project, replace technical front label by direct laser marking on front cover, saving from removing the label material 694 KRMB/yearK) Conduct Gold rush project, Create a pure local brand ‘ Wingoal’ to fully compete with local players by using flexible business model in medium market in China, Force China local players to stay in Medium market and try to stop them penetrating into optimum market, the volume is 120 KPCS/yearL) Conduct DC 1500V project, SE will take around 5% market share in PV segment. Marine segment also has a trend to 1500V for DC application, DC1500V offer will be a milestone for MCCB DC range.M) Support C1 TMD transfer out project (to India), set the EDI link between India. Set parts export flow. Show less

  • Licenses & Certifications

    • 内审员, 项目管理, 玛氏培训讲师, 精益生产

      冠智达, 前程无忧, 玛氏大学, 冠卓
      Apr 2011
      View certificate certificate
  • Honors & Awards

    • Awarded to Hai Huang
      亚太管理培训生改善项目第一名 艾利丹尼森亚太管理层 Jun 2013 热转印车间调机纸用便宜的白纸替代, 成本下降37%。此项目被分享到全球作为Best Practice, 被评为亚太管理培训生改善项目评比第一名。
  • Volunteer Experience

    • 企业联络人

      Issued by 艾利丹尼森 on Jun 2012
      艾利丹尼森Associated with Hai Huang