Youssef Hakko, MIEAust, MAIPM

Youssef Hakko, MIEAust, MAIPM

Asset Engineer

Followers of Youssef Hakko, MIEAust, MAIPM2000 followers
location of Youssef Hakko, MIEAust, MAIPMGreater Sydney Area

Connect with Youssef Hakko, MIEAust, MAIPM to Send Message

Connect

Connect with Youssef Hakko, MIEAust, MAIPM to Send Message

Connect
  • Timeline

  • About me

    Senior Project Manager at Abergeldie Complex Infrastructure

  • Education

    • St Patricks Marist College

      -
    • Opportune

      2015 - 2017
      Diploma Project Management
    • Health & Safety Advisory Service Pty Ltd

      2010 - 2011
      Diploma OHS
    • Absorb Training

      2012 - 2013
      Diploma Environmental Management
    • Academy

      2011 - 2012
      Certificate IV Frontline Management
    • Health & Safety Advisory Service Pty Ltd

      2010 - 2011
      Certificate IV Training and Assessment
    • Absorb Training

      2010 - 2010
      Certificate IV On-site Environmental Management
    • Health & Safety Advisory Service Pty Ltd

      2008 - 2008
      Certificate IV OHS
    • TAFE

      2002 - 2002
      Certificate IV Building Studies, Residential
    • University of Western Sydney

      1994 - 2003
      Bachelor of Engineering (Civil)
  • Experience

    • Campbelltown City Council

      Jan 2000 - Mar 2000
      Asset Engineer

      Work Experience

    • Clogher Excavations Pty Ltd

      May 2000 - May 2008
      Project Engineer

      An accredited Sydney Water major constructor in sewer and water main projects, construction of new assets and associated structures. Oversee smaller projects from estimating, site establishment, construction and handover.

    • UGL

      May 2008 - Sept 2017

      I started working in the estimating department, tendering on Sydney Water Projects before moving out to Sydney Water Wastewater Treatment Plant at Quakers Hill.The treatment plant has 3 ponds requiring relining which I managed Managed / Supervised. A specialist contractor was engaged to remove the existing liner and replace. The new liner consisted 4 layers made up of a geofabric between the subgrade and 2mm thick HDPE secondary layer, followed by a geo-composite drainage layer and sealed off with a 1.5mm thick HDPE primary liner. The 3 ponds had a 11,000m^2 of surface area to be lined and fixing liner to existing concrete structures. The project also included ARC testing followed by hydrostatic testing before finalising all quality documentation and handing back to the client. Show less The Green Square Stormwater Drain is part of the major development of the Green Square precinct. The proposed stormwater drain is an augmentation of the existing stormwater drainage within the catchment and designed to reduce flooding in the event of a significant storm event. With the majority of the project being trenchless, there are a number of utilities clasing with the proposed alignment. I have been assigned to manage the diversion of all utilities within the alignment. These include DN840 steel watermain, 33kV Power, 11kV Power, International Optical Fibres, Show less The Bargo and Buxton Wastewater Scheme is a sewage infrastructure project delivered by the Priority Sewerage Program Alliance for the towns of Bargo and Buxton, NSW.Construction of a low pressure reticulation network, over 1100 individual tanks and a transfer main to the Picton Sewage Treatment plant required a high level of Community, Safety, Quality and Environmental management.I was the senior project engineer managing a team and 8 crews to install collection tanks with associated pipework and control panels on 1100 properties over two suburbs Show less I am on secondmemt to the SewerFix Wet Weather Alliance (SWWA) Program. Projects that I have worked on since joining include:Blackwattle Bay Sewer/Stormwater Separation - Working within some of Sydney Water's oldest assets and installing new pipework within oviform in and around Broadway. Install new sewer service under existing railway lines at Redfern Station.Northern Beaches Local Solutions- the construction of 3.5km of new sewer predominantly using tenchless technology such as microtunnelling, pipe bursting, pipe jacking and horizontal directional drilling.Illawarra relief sewer project - construction of both online and offline storage pipes upto 1800mm diameter reinforced concrete pipes.Quakers Hill WRP - Construction of a new Sewer Pumping Station (SPS-1174) for Sydney Water to replace the existing. The new structure is 20m in diameter and 20m in depth with associated pipework and valve chambersNorthern Beaches Storage Project - Construction of an 18 megalitre above ground storage tank Show less

      • Senior Project Engineer

        Jan 2017 - Sept 2017
      • Senior Project Engineer / Pipework & Culvert Manager

        Mar 2015 - Jan 2017
      • Construction Manager

        Dec 2013 - Mar 2015
      • Senior Project Engineer

        Apr 2013 - Dec 2013
      • Project Engineer

        May 2008 - Apr 2013
    • Zinfra

      Sept 2017 - Dec 2018
      Project Manager
    • Interflow Pty Ltd

      Dec 2018 - Jul 2020
      Project Manager
    • Abergeldie Complex Infrastructure

      Jul 2020 - now
      • Senior Project Manager

        Feb 2023 - now
      • Project Manager

        Jul 2020 - Feb 2023
  • Licenses & Certifications

    • MAIPM

      Australian Institute of Project Management AIPM
      Aug 2020
    • MIEAust

      Engineers Australia
      Aug 2008