Project Engineer| Quantity Survey | Cost Estimation | Planning & Project Control
Education
%2CSANGLI-M.S.webp)
Walchand college of engineering(a govt. aided autonomous institute),sangli-m.s
2013 - 2017Bachelor of technology (b.tech.) cpi- 8.16Activities and Societies: 1. Organiser of Technical and Non technical events.
Experience

Hindustan construction company
Jun 2017 - Jul 2021Mumbai Metro Line- 3.UGC Pkg-02: Construction of four Underground Metro station including Twin Tunnel of 3.7km in between them.Job Responsibility: •Having a key responsibility in the construction activity of Exaction Support, Secant Pile work, Casting of permanent structure.•Having experience of mass concreting in a single poured in base slab.(950 Cum)•Entry Exit excavation, Utility diversion, road diversion, Soldier pile, lagging, fabrication of Waller, strut, diagonal & erection.•Executed Water proofing works at Station Area.•Preparing schematic drawings for Temporary Road diversion works and execute the same.•Preparation of 03 Week Rolling Program and Monthly Reconciliation Statement for Major Material•Cost effective management by minimizing rework and reducing the wastage•Coordinating with other interface contractors and clients for quality related issues.•Checking the Drawings and executing in site with all quality requirements. •Achievement of key date has always been my top priority. Show less Contract : Construction of 4.07 km corridor of the underground metro line including four underground stations at Chatrapati Shivaji Terminus, Kalbadevi, Girgaon, Grant Road and twin bored tunnels of total length of 3.7 km.Job Responsibility:•Having a key responsibility in the construction activity of piling work.•Bar bending and scheduling work.•Material procurement.•Coordinating with other interface contractors and clients for quality related issues.•Site contractor and Client billing work.•Preparation of Reconciliation statement for Major Material.•Having experience of working in high water level during excavation of base slab.•Shotcrete work in rock face with rock bolting.•Preparation of Launching Shaft for Tunnel Boring Machine.•Checking the Drawings and executing in site with all quality requirements. Show less
Quantity Surveyor
Jul 2018 - Jul 2021Graduate Engineering Trainee
Jun 2017 - Jun 2018

Tata projects
Jul 2021 - Feb 2023Senior engineer- quantity survey•Pune Metro Line-01 (Underground Line)UGC Pkg-01 & 02: Construction of 05 Underground Metro Station including Twin Tunnel of 6.06km in between them.Responsibilities:•Contributing to QS teams in EPC Lump Sum type project.•Responsible for preparation of comparative sheet for Client Invoice against PRW/Subcontractor Costs (Architecture/Finishing work).•Prepearion of Subcontractor Bills(Measurement Sheet) & Valuation of same using IFS application on Monthly basis.•Preparation of Site Liability Statement.• Having key responsibility in Quantification of Construction Materials like Steel, Concrete & Other misc item required for execution of project.• Quantification of Architectural/Finishing Activity for Station Building.•Preparation & Updation of Monthly BAT(Billing Assurance Tool) Report.•Preparation of Joint Measurement sheet & Subcontractors RA Bill on Monthly Basis.•Work order preparation & Valuation of Subcontractor Bill using IFS Application •Preparation of Major Material Requirement for the Month.•Preparation of Monthly Reconciliation Statement for Major Construction Materials.• Preparation & Checking of Bar Bending Schedule for Underground Metro works. Show less

Dar
Feb 2023 - Aug 2024Engineer - project management & contracts1. Contributing to the QS team in EPC lumpsum type & item rate project.2. Preparation of Tender Documents including bill of quantities, MOM & specifications.3. I have to review various proposals from the tenderer & prepare tenderevaluation report for the same.4. Contributing to the costing team in preparation of priced BOQ &compilation of BOQ received from various trade.5. I have responsibility of quantification process based on IS 1200, SP-27 & POMI.6. Co-ordination with various trade for approval of various submittalslike shop drawings, material samples & work programs.7. I have to prepare Minutes of Meeting for various meetings held withclient & contractor.8. I also have to deal with Sub-Contractors on a day-to-day basis fortracking work progress at site and certification of bills.9. I have key responsibility in quantity take-off from various drawings using AutoCAD & LYN software. Show less
.webp)
Megha engineering and infrastructures ltd (meil)
Aug 2024 - Dec 2024Senior project coordinator• Coordination with headquarters for all MEIL projects in the Mumbai region.• Managing resources, including team members, budget, and materials, to ensure efficient project execution.• Preparation of monthly cash flow and earned value analysis reports.• Acting as the primary point of contact for stakeholders, providing updates on project progress and addressing concerns.• Monitoring of project expenses to ensure adherence to budget constraints.• Preparation of status reports, meeting minutes, and project deliverables.• Review of project plans, timelines, and schedules to ensure all project milestones and deadlines were met. Show less

Khatib & alami
Dec 2024 - nowEngineer- quantity survey & estimation
Licenses & Certifications
- View certificate

Planning & control with oracle primavera p6 ppm professional
UdemyJan 2024 
Microsoft power bi desktop for business intelligence
UdemyJan 2025
Volunteer Experience
Co-Convenor
Issued by Vision-National Level Technical Symposium on Sept 2016
Associated with Pawan Birajdar
Languages
- enEnglish
- maMarathi
- hiHindi
Recommendations

Alican ciner
Senior BIM Modelleur @ Unica Datacenters | Co-Founder & BIM Consultant @ Virtutect | Data Center Des...Amsterdam, North Holland, Netherlands
Hưng nguyễn duy
Senior Manager, IT Infrastructure at Generali Vietnam Life InsuranceHo Chi Minh City, Vietnam
Rakhea jasmine paquita della concetta dewi
Bachelor of Law | LegalBanjarbaru, Calimantã Meridional, Indonésia
Jake edmonstone
Combinatorics & Optimization | Computer Science @ UWaterlooBurlington, Ontario, Canada
Brandon stewart, leed ap
Director - South Division Lead at Cullen Construction ManagementAustin, Texas, United States
Andrew wallach
Senior Director - Paid Media at Excelsior Equity PartnersTucson, Arizona, United States
Felicity cheal
Return to Work Coordinator at Port Stephens CouncilZona extinsă Newcastle
Vijay kumar
Legal Sapient| Founder DigiLaw Society | Legal Advisor | Legal Trainer | Climate Activist | YLCian-2...Hyderabad, Sindh, Pakistan
Alex thériault, cpa
Manager, Tax at Doane Grant Thornton LLP (Canada)Greater Moncton Metropolitan Area
Megan mcdonald
Justice-Based Case Management | Drug & Alcohol Counsellor | Mental Health Counselling | Research Ass...Greater Ottawa Metropolitan Area
Leona tuaoa-medeiros
Event Manager at Club Demonstration ServicesNorth Las Vegas, Nevada, United States
Ullrich tesch
Team Lead Product Line; Mechanical Engineer (B.Sc.) & Cutting Machine OperatorMunich, Bavaria, Germany
Gopal deshmukh
Embedded Software EngineerPune, Maharashtra, India
Raktim d.
Hardware Design Engineer @ FORVIA HELLA | Hardware Design|Expertise in EMI/EMC Standards CISPR 25|Sc...Silchar, Assam, India
Simon bruno
SEO & Data Technician at BonfireGreater Perth Area
Sarah bedewi سارة بديوي
Teacher, IELTS, Physics, Arabic for non-natives, IGCSE, LSS and EngineerUnited Arab Emirates
Raqim fraz
Student at Noida Institute of Engineering & TechnologyPatna, Bihar, India
Sara prickett
Chief Scientific Officer and Co-Founder, Aravax Pty Ltd (Biotech)Barcelona, Catalonia, Spain
Lauryn suwa
Second Year Doctor of Occupational Therapy Student at Pacific UniversityPortland, Oregon, United States
Paul petrie cmgr fellow cmi finstlm mapm msc assoc cipd
Operations/Production Manager at Marshall Land SystemsCentral Bedfordshire, England, United Kingdom
...