MV JEYAMARIYAPPAN

MV JEYAMARIYAPPAN

Senior Project Engineer

Followers of MV JEYAMARIYAPPAN484 followers
location of MV JEYAMARIYAPPANTamil Nadu, India

Connect with MV JEYAMARIYAPPAN to Send Message

Connect

Connect with MV JEYAMARIYAPPAN to Send Message

Connect
  • Timeline

  • About me

    Digital Grid, Smart Infrastructure

  • Education

    • SRM VALLIAMMAI

      -
      Bachelor of Engineering (BE) Electronic
  • Experience

    • NISSI Engineering Solution Pvt. Ltd.

      Sept 2010 - Dec 2015
      Senior Project Engineer

      FOR ALSTOM:• Installation of PACIS/DSAGILE system and other related PC OS installation, Teaming Installation, SQL Server installation• Inspection of FO cable and checked all the IED’s for communication.• Boot install & Firmware up gradation of C264• SCE database Preparation & modification• Logic configuration in SCE for making interlocks as per scheme• Goose configuration, ICD, SCD, CID file creation• SAS Integration with third party IED's • GPS installation and checked time synchronization using NTP.• Resolving technical issues with client.• Final testing & Commissioning of SAS System with customer approval• Gateway commissioning and local & remote testing.For PURI AKRAYA:• Project management.• Inspection of electrical equipmentFOR SIEMENS:• Installation of TOOLBOX, DIGSI, SICAM Software in PC.• Commissioning of RTU using IEC61850 protocol.• Configuration of RTU using TOOLBOX software.• Configuration of IEDs[Intelligent Electronic Device] using DIGSI software.• Configuration of HMI using SICAM software.• Testing of all the signals by simulating it from RTU, IEDs panel side .• Testing of all the signals in HMI from control and relay panels of a Substation• Giving training about the whole system to Substation officials.• Integration of all signals from RTUs to DC and DC to LDC.FOR ABB:• Replacement of SMB.• Assembling of PCB in MSTARTS.• Testing of MSTARTS .• Commissioned MSTARTS in ULTRATECH CEMENT PLANT by checking its communication using ABB software Show less

    • Schneider Electric

      Jan 2015 - Feb 2016

      • Installation of PACIS/DSAGILE system and other related PC OS installation, Teaming Installation, SQL Server installation• Inspection of FO cable and checked all the IED’s for communication.• Boot install & Firmware up gradation of C264• SCE database Preparation & modification• Logic configuration in SCE for making interlocks as per scheme• Goose configuration, ICD, SCD, CID file creation• SAS Integration with third party IED's • GPS installation and checked time synchronization using NTP.• Resolving technical issues with client.• Final testing & Commissioning of SAS System with customer approval• Gateway commissioning and local & remote testing. Show less

      • Senior Engineer

        Jan 2015 - Feb 2016
      • Senior Engineer

        Jan 2015 - Feb 2016
    • GE

      Feb 2016 - Oct 2021

      • Technical validation during Tendering stage of Projects • Engineering complete project for Digital substation & Network design• Engineering complete project in SCADA and RTU systems• Customer discussion for SAS document approval• Interaction with various vendors for product finalization for SAS design• Interaction with various stake holders of a project• Conducting FAT with customers• Technical guidance/support to various project teams• Interoperability tests at customer’s place Show less

      • SAS DESIGN

        Feb 2016 - Oct 2021
      • Control Engineer

        Feb 2016 - Feb 2016
    • Siemens

      Nov 2021 - now
      Manager- Smart Infrastructure
  • Licenses & Certifications

    • Cisco Certified Network Associate Industrial (CCNA I)

      Network rhinos
    • Industrial automation

      Technocrat automation
      Jun 2010