Debjyoti Paul, C Eng, MIE. Sustainability Champion

Debjyoti paul, c eng, mie. sustainability champion

bookmark on deepenrich
location of Debjyoti Paul, C Eng, MIE. Sustainability ChampionVadodara, Gujarat, India
Followers of Debjyoti Paul, C Eng, MIE. Sustainability Champion3000 followers
  • Timeline

  • About me

    I am engaged in learning the In and out activities of offshore engineering works from FEED to Construction.

  • Education

    • Kendriya vidyalaya

      1997 - 1997
      10 general
    • Amravati university

      2003 - 2006
      Bachelors of engineering mechanical engineering

      Gold medalist, 1st class with distinction grade.Learned about the field of mechanical engineering.

    • Kendriya vidyalaya

      1999 - 1999
      12 science
    • Upes

      2022 - 2024
      Master of business administration - mba logistics, materials, and supply chain management

      Learning about exciting field of logistics and supply chain. Would like to work for REE, Green Energy, Sustainable Earth, Carbon Capture and Zero Carbon emissions and Hydrogen technology.

  • Experience

    • Essar oil

      May 2006 - Nov 2008
      Get to engineer(onshore)

      Stress Analysis of 1st Tank-farm and tie-lines in OSBL area for Essar oil limited.L.P.,M.P. and H.P. steam header stress analysis on pipe-rack. for Essar oil limted.Cross-country Piping connecting Essar refinany and VOTL terminal. for Essar oil limited.

    • Triune energy services pvt. ltd.

      Nov 2008 - Sept 2011
      Sr.piping engineer: stress and supporting(offshore)

      Senior Engineer 1st Production platform with bridges. FOROOZAN, IOEC, IRAN(Offshore).2nd Safwan,Gas compression stations,KOC,kuwait.1st Gas compression facility for Reliance. East west pipeline project, India. 2nd NHT-CCR facility for BPCL India. 1st NHDT-ISOM facility for CPCL India.

    • Samsung heavy industries india pvt. ltd.

      Sept 2011 - Sept 2013
      Sr. piping stress engineer(offshore)

      Worked as stress lead. 1st Semisubmersible Ichythy's CPF Topside chilled water systems. 2nd FPSO project: Egina FPSO,Nigeria; (Internal project); Detailed engineering of 3 modules. 1st Drill ship: SEADRILL:Topside, detail engineering project of drill ship,Norway.1st Jacked up fixed platform: Detail engineering of Topside facilities for ONGC, Mobile offshore Production Unit, Bombay High.Brown field conversion project.1st FPSO project: Detail engineering of Topside facilities of Jordbaer FPSO, BG-Teekay,Norway,North sea. at SHI India.(Worked as acting stress lead). Show less

    • Jgc construction international

      Jan 2014 - Feb 2016
      Sr. piping stress engineer(onshore)

      Worked as Sr. Piping Stress Engineer3rd refinery project: Jazan refinery and Terminal project for saudi aramco.Its a large grass-root refinery project with approximately 19400 lines. And critical systems includes almost 6500 lines. Its a grassroot refinery project consisting of FCCU, VDU, CDU, NHT, CCR, NHDT, ISOMERIZATION, Para benzene units. KNPC CFP. Utility area piping analysis.

    • Triune energy services pvt. ltd.

      Apr 2016 - Dec 2019
      Manager-piping stress(offshore)

      Worked as Lead Stress Engineer for4th FPSO:ENI FPSO Detail Engineer design for Ms. MODEC INC. Singapore.3rd FPSO:BAROOSA FPSO, Front end engineering design for Ms. MODEC INC., Japan. ONGC-LEWPP-1.Revamp and replacement of 20 unmanned ONGC wellhead platforms. Zubair oil field U/G GRE fire water network.Stress analysis of GRE. 3rd project. KOC SEK Manifold bartee installation U/G 36" lines. Stress analysis of new bypass connections to existing pipeline systems.

    • Toyo engineering corporation

      Dec 2019 - Aug 2022
      Principle engineer (offshore)

      6th FPSO project Santos BW FPSO, Barossa Field, Australia.5th FPSO project: MV32, Barroso, Brazil for Ms. MODEC Singapore.

    • Worley

      Aug 2022 - now
      Manager (offshore)

      Working on energy transition projects to emerge as global team player in meeting UN climate control ambition of net zero carbon emissions by 2050.Project 1: Ballymore phase 4- it's a semi submersible( offshore closed)Project 2: 28 fixed platform for life extension work of GRP piping including bridges.( offshore ongoing)Project 3: WLNG feed (onshore- closed)Project 4: Heartwell Valentine Renewable diesel (onshore closed).Project 5: RIL CPVC ( onshore ongoing)

  • Licenses & Certifications

    • Chartered engineer

      The institution of engineers (india)
      Feb 2020
    • Energy transition passport by worley

      Worley
      Aug 2022
  • Honors & Awards

    • Awarded to Debjyoti Paul, C Eng, MIE. Sustainability Champion
      MIE,Chartered-Engineer(I) Institute of Engineers (India) December 1, 2019
    • Awarded to Debjyoti Paul, C Eng, MIE. Sustainability Champion
      Gold medalist B N college of Engineering Pusad Sep 2006 I was 5th University topper and Engineering college topper. In our university there were 7 college.