
Timeline
About me
Design Programme Manager - Babcock International Group
Education

Ned university of engineering and technology
1998 - 2001Bachelor of engineering (b.e.) industrial electronics first divisionActivities and Societies: IEEE Bachelor of Engineering (Industrial Electronics)
Experience
%20Ltd..webp)
Hilal foods (pvt) ltd.
Jun 2002 - Jan 2004Electronics engineer• Troubleshooting and Maintenance of PLC’s Simatic-7 315 and Simatic-5 95U and 115U.• Work experience on Power Electronics circuitry including Rectifiers, Inverters (AC motor drives) and DC motor drives.• Installation and Maintenance of field Instrumentation, Automation and Speed Control systems. • Supervision of Erection of New Plants.
.webp)
Pakistan international container terminal limited (pict)
Jan 2004 - Jul 2005Electronics engineer• Troubleshooting and Maintenance of PLC’s Simatic-7 416-2 DP and Fuji (Micrex-F). Both from hardware and software side.• Troubleshooting and Maintenance of Drives Siemens (Simovert), Fuji (Frenic 5000VG7S) & Danfoss and Rectifier Unit. Both from hardware and software side.• To maintain an inventory of spare parts.• To conduct Predictive, Preventive & Breakdown Maintenance.

Siemens
Aug 2005 - Oct 2006Project engineer• Co-ordination in Erection, Testing and Commissioning of Siemens 220kV and 132kV GIS (Gas Insulated Switch Gear).• Develop all Planning and Scheduling tools to be used in control, monitoring and reporting of Project status.• Comparative statements, related correspondence with suppliers, obtaining administrative and financial approvals from management.• Review / Assess technical Specification, BOQ (Bill of Quantity) and Drawings to determine suitable vendors and suppliers.• Prepare and issue purchase orders in accordance with selected suppliers, price and technical specifications• Preparation of daily and monthly progress reports for management detailing project status with respect of material position and site progress. Show less

Fatima fertilizer company limited
Nov 2006 - Feb 2008Engineer ii (instruments & control)• Project Cost Estimations• Co-ordination with foreign engineering contractor i.e Snamproggetti, Foster Wheeler, CNCEC, Kawasaki, MW Kellog regarding re-engineering for used plants to be relocated at Sadiqabad - Fatima Fertilizer Project.• Review & comments on P&IDs & Engineering documents related to Automation & Instrumentation for New Plants (Urea, Offsite & Utilities).• Technical Evaluation & discussion with the Vendor regarding GE Gas Turbine Control System Mark-VI, HRSG (DALTEK), USG (MACHHI) , Nitrogen Generation Package (Linde).• Review & Comments on the DCS/ESD (Yokogawa) Centum 3000 and Pro-Safe RS selection of the Hardware according to the Plant requirement.• Technical & Commercial negotiations with the DCS/ESD vendor (Yokogawa). • Technical clarification meetings with the Control Valve Vendor (Fisher) for the selection of the Control Valve as per the process and system requirement.• Assessing Instrument & Control Team in evaluating & Replacement Study of relocated plant’s (CAN, NPK, NA, Ammonia) Distributed Control System & Emergency Shut down System. • Study on Tank Gauging System for Ammonia & Nitric Acid Storage Tank.• Provided support in preparation and illustration of IP based PABX system according to the users’ requirement for Plant and Colony site.• Planning / Scheduling & Preparing bar charts / Timeline for project execution.• Generating RFQ’s for Field Instrumentation to different vendors. • Technical clarification of different field instruments as per system and plant requirement. Show less

Scientechnic
Mar 2008 - Feb 2009Project / electronics engineer• Co-ordination in Erection, Testing and Commissioning of Burj Dubai Residence (BRES SS4) & Old Town (OTWN SS2) Substation• Develop all Planning and Scheduling tools to be used in control, monitoring and reporting of Project status.• Preparation of Daily & Weekly Progress Reports & Plans for DEWA (Owner), EMAAR (Client), Poyry Energy (Consultant), Turner (Project Manager) & Siemens management detailing project status with respect of material position and site progress.

Roads and transport authority
Mar 2009 - May 2014Senior engineer (control systems)•Co-ordination with Contractor i.e Siemens LLC, Schneider Electric, Intertech Vision, Ortana, Scientechnic (Agents for Siemens AG.) & ITS (Intelligent Telecommunication Systems) for the proper Preventive and Corrective Maintenance for different Control Systems which include SCADA System.•Contracts Management, Verification of Works, Quality and Safety Measures as per the Contract Compliance Statement.•Participates in Project Planning, estimating, scheduling, staffing, procurement and execution of Project Scope of Work.•Study plan for the Up gradation of the existing Control Systems and improvement plan for the better efficiency of the Control Systems (especially SCADA Systems).•Review and comments on new and upgraded SCADA Systems Architecture and PLC Panel Diagram.•Technical Clarification with Consultant and Project Contractor of the SCADA Systems (Siemens WinCC & Schneider Electric Vijeo Citect) & PLC’s Systems (Siemens S7400H & Schneider Electric Quantum PLC). •Fully participate and asses in departmental various Audits which includes QHSE (Quality, Health, Safety & Environment), ERM (Enterprise Risk Management), PAS55 (Optimal Management of Physical Assets), ISMS ISO 27001 (Information Security Management System) & Technical Audits like ISO 14001 (Quality Managemenet Systems), ISO 9001, Quality and Health Environment Safety Standards OHSAS 18001, Risk Management ISO 31000, Energy Management ISO 5001. •Preparation of Control Rooms Business Continuity Plan (BCP). •Change Management follow up and preparation of necessary documentation for the Project Variations.•Study department operational and system risks and its mitigation plan.•Study of new advance state of the art systems to adopt latest technology in order to get benefits of new technologies and reduce operational and maintenance cost.•Study for the existing assets life cycle, availability of vendor support and plan accordingly for asset replacement or up gradation. Show less

Wells instrument and electrical
Jun 2014 - Aug 2016Project / automation engineer• Design, configuration, integration and implementation of process control solutions for various industries.• Develop User Requirement Specifications.• Develop software and hardware design specifications.• Design, write, implement, test and document PLC and HMI software.• Develop control system validation/testing protocols.• Specify and purchase PLCs, and other Automation related components• Develop scope of supply documents.• Assist with estimates of man-hours required to complete projects.• Manage automation projects as assigned.• Monitor progress of projects.• Install, test, and start-up control systems on-site. Show less

New zealand steel
Sept 2016 - Oct 2020Project specialist - engineering services• Preparation of Feasibility Reports includes Project Submission Report, Financial Valuation, Risk Assessment and Management Plan, Project Schedule, Project Execution Plan & Customer Requirement Specification (CRS). • Ensure clear communication among all groups involved in successful delivery of Projects.• Setup and implement strategy for successful completion of new and on-going projects to be delivered on time, on budget and on scope.• Manage all post-delivery project needs including confirming project close with key stakeholders, debriefs and creating rebound opportunities and assuring client satisfaction.• Expand and leverage client relationships through understanding of client objectives, participation in coordination and meetings.• Organizing and leading Project kick off calls and briefings, internal kick-off call, external kick-off call with client.• Resource allocation and coordination.• Project Schedule delivery adjusting, tracking and enforcing.• Ownership and management of project materials, consolidating, updating and distribution of materials to support groups. • Maintains detailed written status reports to ensure efficient workflow and adherence to deadlines and deliverables Show less

The kraft heinz company
Nov 2020 - May 2021Project manager / maintenance coordinator• Develop work plan identify parts, materials and resources required. Identify cost within budget. • Organized Preventive Maintenance Plan by plant requirement. Monitored implementation, frequency, results and amended when required to minimize downtime.• Planned and resourced corrective actions to meet operational requirements.• Identified improvements and development scope of projects to improve line efficiencies. • Lead daily and weekly scheduling meeting to review work completed previous day/week, work being done and finalize the next work day/week• Assure safety awareness, safe work and compliance with safety rules and policies in all work performed by maintenance or contractor crews.• Works with Production Planner to establish maintenance work priorities.• Responsible for maintenance budget control. Maintains a cost ledger for all work (planned and unplanned) with estimated or actual cost (with input from Planners & contractor quotes, etc.). Runs and reviews cost transactions to track both actual cost and actual vs. planned cost• Leadership, including workforce engagement, diversity, employee development, and team relations. Show less

New zealand steel
May 2021 - Jan 2023Project specialist - engineering services• Preparation of Feasibility Reports includes Project Submission Report, Financial Valuation, Risk Assessment and Management Plan, Project Schedule, Project Execution Plan & Customer Requirement Specification (CRS).• Ensure clear communication among all groups involved in successful delivery of Projects.• Setup and implement strategy for successful completion of new and on-going projects to be delivered on time, on budget and on scope.• Manage all post-delivery project needs including confirming project close with key stakeholders, debriefs and creating rebound opportunities and assuring client satisfaction.• Expand and leverage client relationships through understanding of client objectives, participation in coordination and meetings.• Organizing and leading Project kick off calls and briefings, internal kick-off call, external kick-off call with client.• Resource allocation and coordination.• Project Schedule delivery adjusting, tracking and enforcing.• Ownership and management of project materials, consolidating, updating and distribution of materials to support groups.• Maintains detailed written status reports to ensure efficient workflow and adherence to deadlines and deliverables Show less

Babcock international group
Jan 2023 - nowDesign programme manager
Licenses & Certifications
.webp)
Certified practising project practitioner (cppp)
Australian institute of project management (aipm)Feb 2024
Caam (certified associate in asset management)
Asset management councilDec 2024
Efqm foundation
EfqmMay 2023
Project management professional
Project management instituteMar 2013
Languages
- enEnglish
- urUrdu
Recommendations

Matthias büttner
General Manager | Finance Manager | InvestorValinhos, São Paulo, Brazil
Adityo abdi guna, chcs
CHCS I AK3U I HR I GA | Comben & Payroll | HSE | RecruitmentWest Java, Indonesia
Nicolas briff
Geologist | Organizational Systemic CoachArgentina
Vinit kumar
Digital Marketing intern at skill circleDelhi, India
Rob barrows
Managing Partner - Family ServiceMemphis, Tennessee, United States
Palak jain
Equity Research Analyst l Financial Modelling l Content Creator l MBA PIMR' 23India
Ashish pal
Electrical Engineer ProfessionalNoida, Uttar Pradesh, India
Marta campillo
Project Manager in Calibre 360 ConsultingMadrid, Community of Madrid, Spain
Mauricio endo higuchi
Data Analytics | Recuperação de Crédito| Resultado | Pricing | AWSSão Paulo, São Paulo, Brazil
Mohd osama
Senior AnalystBiswan, Uttar Pradesh, India
...