    Nov 2009 - Mar 2010

    Quality Control Inspector

    TERMOTECNICA INDUSTRIALE S.r.l.
    Aug 2010 - Mar 2011

    Ingeniero de planificación

    Tecna
    Mar 2011 - Jul 2011

    Quality Assurance Quality Control Inspector

    PACIFIC RUBIALES ENERGY CORP
    Jul 2011 - Aug 2012

    Engineer Quality Control

    Eni
    Aug 2012 - Jun 2013

    Assistant Chief Engineer

    ATB Riva Calzoni S.p.A.
    Mar 2014 - Dec 2015

    Chief Mechanical Engineer

    Sociedad Portuaria Puerto Bahía
    Feb 2016 - Jan 2017

    Mechanical Supervisor Eng

    SACYR
    Feb 2017 - Apr 2019

    Project Manager

    Aquatool S.A.S
    Aug 2017 - Apr 2019

    Mechanical Technician

    WOMA (Australia) Pty Ltd
    Aug 2019 - Apr 2020

    Water jetting operator high pressure

    BAE Systems Australia
    Jun 2020 - Mar 2021

    Project Manager

    IMAINTS
    Mar 2021 - May 2021

    Profesional Pleno

    ITALCO
    May 2021 - Oct 2022

    Director de proyecto

    Pert DPM
    Current Company
    Nov 2022 - now

    Gestor mecánico

    ACI Proyectos SAS
  • About me

    Mechanical auditor Frontera Energy Corp

  • Education

    • Universidad de américa

      2002 - 2008
      Bachelor of engineering - be mechanical engineering/mechanical technology/technician bachelor engineering
    • Navitas college of public safety

      2017 - 2018
      General english course english language and literature/letters
    • Navitas college of public safety

      2019 - 2020
      Ielts course english english language and literature, general
    • Navitas college of public safety

      2018 - 2019
      Cambridge pre test english language and literature, general
    • Politécnico superior de colombia

      2016 - 2016
      Quality audit diploma quality control technology/technician
    • Keystone college of business & technology

      2020 - 2020
      Project managment information technology project management
  • Experience

    • Termotecnica industriale s.r.l.

      Nov 2009 - Mar 2010
      Quality control inspector

      Detailing engineering, procurement (purchases) and EPC construction of the Posos colorados - Galan Poliduct Management for vice-president’s transport of Ecopetrol S.A. According to contract 5205997.Duties• Witnessing NDE inspection (MT, LPT, and PWHT) as per Standards and Test plan.• Incoming material inspection with regards to the actual traceability against manufacturer’scertificate.• Inspecting pipe joints and support assemblies as per standards including marking, fit‐up,weld visual, final dimensional inspection as per approved drawings.• Verifying and controlling the fabrication activities as per the contract specification /codes andapproved drawings.• Monitoring and inspecting of application for pipeline field joint coating.• Witnessing Hydro test for Spools, Pipelines and Risers and Complete Subsea pipeline systems. Show less

    • Tecna

      Aug 2010 - Mar 2011
      Ingeniero de planificación

      Project Onshore Treating Facilities LNG Storage, Condensate Tanks & LPG Recovery Plant, Pipe Line Transmission & DistributionDuties:• Interpret drawings and codes (plan, general arrangement drawings, joint connection details, P&ID, iso, spool and general arrangement drawing) project spec. Final documentation of piping Ensure Site queries, engineering modification Review the As built drawings.• Attend & witness RFI’s, surveillance inspection at plant piping and to control welding & post weld activities including witness of WQT & PQR, Dimensional Control. Show less

    • Pacific rubiales energy corp

      Mar 2011 - Jul 2011
      Quality assurance quality control inspector
    • Eni

      Jul 2011 - Aug 2012
      Engineer quality control

      Project: Design and construction of the infrastructure of the maritime terminal, located in Cienaga, Colombia; which includes a berth of 1700 m, a loading berth of 347.5 m, and berth of 160 m, along with dredging works of the turning basin and access channel.Duties:• Monitoring and inspection of pipeline welding and filed joint coating.• Responsible for performing daily inspection and reporting as per approved inspection test plan.• Witnessing the welder qualification test (WQT) as per approved WPS.• Visual and Dimensioning inspection of weld profile surface, weld defects, alignment,dimensioning arc strike, surface porosity, inter pass and post weld cleaning, and dimensional tolerance. Show less

    • Atb riva calzoni s.p.a.

      Aug 2012 - Jun 2013
      Assistant chief engineer

      Design, detailed engineering, construction and assembly of the pipeline for the armor of conduction in the loading tunnels, according to the CEQ-21 contract for EMGESA of the El Quimbo Gigante Hydroelectric Power Plant project.Duties:• Responsible for performing daily inspection and reporting as per approved inspection test plan.• Notifying the non-conformance identified during site inspection and recommended correctivemeasures to site supervisor through Manager Project.• Preparation of daily reports and documentation for pipeline, Field joint coating, Painting, relatedfabrications,• Coordinating with project engineers and supervisors for fabrications, Installation and finaldocuments submissions. Show less

    • Sociedad portuaria puerto bahía

      Mar 2014 - Dec 2015
      Chief mechanical engineer

      Project: PUERTO BAHIA - Terminal for the storage of hydrocarbons and bulk liquids in mechanical works, (construction, installation, assembly, painting and tests) offshore – onshore section. Pacific Infrastructure. Contract PTB – 083-2013. Mechanical, electrical and instrumentation works for the Crude Oil Import project for the Liquid Berth Terminal – Vessel Main Platform. Duties:• Monitor all piping (process and marine) construction activities from pre fabrication of spools throughout to field installation, line walk down, testing, reinstatement activities and ensure all activities are executed in accordance with the appropriate standards, procedures and the schedule.• Monitoring and inspection of pipeline welding and filed joint coating.• Witnessing NDE inspection (MT, LPT, and PWHT) as per Standards and Test plan.• Conducting field testing for paint application like Peel test, Impact test, DFT, Adhesion test. Show less

    • Sacyr

      Feb 2016 - Jan 2017
      Mechanical supervisor eng

      Project: Sociedad Portuaria El Cayao. Engineering, procurement and construction of the SPEC LNG receiving, reloading, storage and regasification infrastructure On-shore, Off-Shore located in Cartagena, Colombia.Duties:• Maintain and updated data, such as timeline progress, production, and their records, and prepare management reports and weekly updates.• Review Piping dimensional control reports to ensure that tolerance requirements are met.• Interpretation of test results to AWS, ASME, ASTM and API standards and project specifications Monitor all piping construction activities from pre fabrication of spools through out to field installation, line walk down, testing, reinstatement activities and ensure all activities are executedin accordance with the appropriate standards Show less

    • Aquatool s.a.s

      Feb 2017 - Apr 2019
      Project manager

      Ensure that the work is executed in compliance with the technical specifications established in the approved RFQ, along with the quality department, optimizing at the same time the use of mechanical equipment resources and labor.

    • Woma (australia) pty ltd

      Aug 2017 - Apr 2019
      Mechanical technician

      Duties:• Oversee the incoming freight to verify proper specifications, including measurement and unit count, and promptly reject sub-par materials before they arrive at assembly.• Verify the efficiency and safety of in-process production by completing a series of visual and specialized tests.• Monitor the overall quality and function of each product that leaves the assembly line to confirm accuracy, and report discrepancies to the production supervisor.• Maintain an accurate and detailed log of inspections, including re-work, waste output, equipment repair, worker productivity, and facility adherence to required codes. Show less

    • Bae systems australia

      Aug 2019 - Apr 2020
      Water jetting operator high pressure
    • Imaints

      Jun 2020 - Mar 2021
      Project manager
    • Italco

      Mar 2021 - May 2021
      Profesional pleno
    • Pert dpm

      May 2021 - Oct 2022
      Director de proyecto
    • Aci proyectos sas

      Nov 2022 - now
      Gestor mecánico
  • Licenses & Certifications

    • Asnt ndt level ii certification - liquid penetrant testing (pt) (asnt-ndt2-pt)

      Metalurgica eteca sl
      Jan 2017
    • Asnt central certification program level ii - visual testing (accp-vt)

      Metalurgica eteca sl
      Jan 2017