  • Timeline

    Jan 2011 - Apr 2012

    Electrical-Electronic Engineer

    Güngör Elektrik Tic. ve San. Ltd. Şti.
    Apr 2012 - Jun 2013

    Site Engineer

    Ufuk Ataç-Eltem Mühendislik
    Sept 2013 - Jun 2017

    Senior Project Coordinator

    Tuşba Elektrik İnş. San.Tic.Ltd.Şti.
    Jul 2017 - Sept 2019

    Site Manager

    Aktifsel Enerji Elektrik Elektronik İnşaat Doğalgaz Taah.Tic.Ltd.Şti.
    Oct 2019 - Mar 2020

    Electrical Site Engineer

    GE Grid Solutions
    Mar 2020 - Apr 2022

    Project Coordinator

    Yılmaz Elektrik ve İnşaat San.Tic. A.Ş.
    Mar 2022 - Dec 2022

    Project Manager

    Aktifsel Enerji Elektrik Elektronik İnş. Doğalgaz Taah. Tic. Ltd. Şti.
    Current Company
    Jan 2023 - now

    Dicle Yeka Project Manager

    Eksim Enerji A.Ş.
  • About me

    Dicle Yeka Project Manager

  • Education

    • Dicle university

      2022 - 2025
      Graduate renewable energy sources
    • Dicle university

      2006 - 2010
      Electrical and electronics engineer elektrik ve elektronik mühendisliği

      Activities and Societies: IEEE,EMOGENÇ

  • Experience

    • Güngör elektrik tic. ve san. ltd. şti.

      Jan 2011 - Apr 2012
      Electrical-electronic engineer

      ∙ 380 kV Diyarbakir 3 TS Extension: Within the scope of the work, the existing 380 kV switchgear was installed with the 2nd main busbar voltage transformer and earth blade and the coupling feeder was equipped.∙ Installed a voltage transformer and a coupling feeder for a 380 kw switchyard.∙ The 380 kV switchgear was extended by 2 gentlemen and the Karakaya-2 feeder was installed.∙ Installed Karakaya-2 feeder.∙ 380/33 kV bank feeder was installed together with 380/33 kV-90/125MVA power transformer.∙ Installed a 380/33 kw - 90/125 mw power distribution unit and a 380/33 kw bank feeder.∙ Differential protection was installed for the existing 380 kV benches.∙ Installed five SDK for TR5 and TR6 banks and Karakaya-2 feeder.∙ 5 SDKs were installed for 380 kV TR5 and TR6 banks, Karakaya 2 and coupling feeder.∙ Installed five command panels for 23 feeders.∙ Installed four relay panels for TR5, TR6 and Karakaya-2 feeders. Show less

    • Ufuk ataç-eltem mühendislik

      Apr 2012 - Jun 2013
      Site engineer

      ∙ Coordinated the construction of metal clad and command building at the Diyarbakir central power distribution unit of 154 kw.∙ Installed the double-bar switchyard.∙ Installed three 154 kw feeder, a 154 kw couplage feeder and two substation feeder.∙ Delivered and installed one 154/33.6 kw and one 80 (100) mw power distribution unit.∙ Delivered and installed five command panels and three relay panels for a switchyard of 154 kw.∙ Delivered and installed 23 feeders for a switchyard of 154 kw.∙ Delivered and installed one meter panel, one BTP and six SDK.∙ Delivered and installed one DC panel for 48 V DC system and three DC and one AC panel for 110 V DC system. Show less

    • Tuşba elektrik i̇nş. san.tic.ltd.şti.

      Sept 2013 - Jun 2017
      Senior project coordinator

      ∙ Coordinated the underground implementation of 8000 m. double circiut 1*400/25 xlpe cable. Installed a six-celled and a seven-celled concrete substation for FORUM Shopping Mall.∙ Coordinated the city grid construction of Kayapinar district in Diyarbakir.∙ Coordinated the transformation of open switchyard to a modular cell.

    • Aktifsel enerji elektrik elektronik i̇nşaat doğalgaz taah.tic.ltd.şti.

      Jul 2017 - Sept 2019
      Site manager

      ∙ Coordinated the assembly and launch of two power distribution unit of 154 kW with two feeders. These units were commissioned by Akfen Holding to Siemens for the purpose of energy production with wind turbines.

    • Ge grid solutions

      Oct 2019 - Mar 2020
      Electrical site engineer

      Within the scope of Sarıkamış Karakurt HEPP work, we are constructing a 154 kV transformer center consisting of 3 transformer feeders, 3 line feeders and transfer feeders, and the transformer center is about to be finished. In addition, within the scope of the work, all electrical assembly works, automation works and commissioning of 1 hydroelectric power plant with a total installed power of 100 MV, consisting of 3 generators, were successfully carried out.

    • Yılmaz elektrik ve i̇nşaat san.tic. a.ş.

      Mar 2020 - Apr 2022
      Project coordinator

      Şanlıurfa 3rd and 4th Group Siverek District Underground LV/MV facility construction work continues.Şanlıurfa 2.Group Siverek District Siverek 4 Underground LV/MV facility construction and provisional acceptances were made and the work was delivered.(2020)

    • Aktifsel enerji elektrik elektronik i̇nş. doğalgaz taah. tic. ltd. şti.

      Mar 2022 - Dec 2022
      Project manager

      BAZIAN SIMPLE CYCLE POWER PLANT PROJECT ( 505 MW ) Fast-Tracking EPCProject Tracking And Controlling for ;• To conduct inspection of all ongoing activities for electrical&instrument installations.• Inspection installation of Switchyard Electrical Equipment & Testing such as (Load Test e.c.)• Reporting the noncompliances to client in terms of technical issues.• QA/QC documentation and review Contractor construction electrical procedures.• Supervise and inspect installation of cable, cable tray ,ductbank&cable trench•Lighting, distribution&control panel, all electrical equipment and grounding system, etc with respect to standarts and typical details..• Witness and verify grounding system tests and lightning protection system tests.• Responsible from equipment installation and continue energizing of electrical equipment to pre-commissioning and commissioning.• Project Follow and Inspection of Application Site• Prepare dayly surveillance reports, non conformance reports and verification of Show less

    • Eksim enerji a.ş.

      Jan 2023 - now
      Dicle yeka project manager

      ∙ Within the scope of Viranşehir Yeka GES-4, I have been carrying out the works since the permit processes of the work with the official institutions within the scope of the establishment of the 150 MWe (Tracker) capacity GES field and the establishment of the 6-feeder 154 kV TM and 36 km long 99-pole 154 kV transmission line. Our project is still ongoing.

  • Licenses & Certifications

    • Lpg otogaz i̇stasyonu sorumlu müdür eğitimi

      Makina mühendisleri odası
      Aug 2015
    • İtüro robot oli̇mpi̇yatlari

      Istanbul technical university
      Apr 2009
    • Kariyer yönetimi ve mesleki danışmanlık semineri

      Dicle university
      Dec 2015
    • Yüksek gerilim tesislerinde i̇şletme sorumluluğu yetkilendirme belgesi eğitimi

      Tmmob elektrik mühendisleri odası / chamber of electrical engineers of turkey
      Mar 2015
    • Elektrik 1kv üstü ve 1kv altı tesisler topraklama yetkilendirme belgesi eğitimi

      Tmmob elektrik mühendisleri odası / chamber of electrical engineers of turkey
      May 2015