
Timeline
About me
Full Stack Engineer at Journee
Education

Itesm
2009 - 2013Engineer mecatronicsActivities and Societies: Modalidad de Experiencia Profesional. Congreso de Mecatrónica

Tecnológico de monterrey
2018 - 2019Full stack developer computer scienceFull Stack Development bootcamp. MERN (Mongo, Express, React and Node) as the main stack and 6 months of skill practice, with homeworks and projects, with all the different technologies.

Instituto tecnológico y de estudios superiores de monterrey / itesm
2009 - 2013Engineer's degree mechatronics, robotics, and automation engineering
Experience

Praxair
Jan 2013 - Jul 2013Practicante de confiabilidadEncargado de actualizar y programar la base de datos de confiabilidad y mantenimiento.

London consulting group
Jan 2014 - Jul 2018Process analyst and Operation consultant. With te objective to Detect the activities which really add value to the process. Redesign the working method implementing the required changes and solutions guarantying a sustainable result.
Senior Business Coach
Apr 2017 - Jul 2018Business Coach
Jan 2014 - Mar 2017

Banregio
Jan 2014 - Apr 2014Jr business coachProcess analysis in the IT department, work system improvement to minimize software development cost. 16% development hour cost reduction.

Fibra inn
May 2014 - Jul 2015Procedures for project control were designed and the supplier's negotiation model was established. The capital investment execution model was implemented and the Asset Supervision model was established.- A 28% reduction in investment costs in the department's main accounts through the supplier's negotiationmodel. Design and implementation of the following: optimal workforce model based on volumetric, recruitment and selection processes, orientation and training models, standard rates for positions and salaries, creation of the area's indicators.- An 8% reduction in hotel's payrolls guaranteeing levels of service to clients.- A 51% reduction in the personnel turnover rate
Business Coach
Jan 2015 - Jul 2015Business Coach
May 2014 - Dec 2014

Katcon
Aug 2015 - Jul 2016Programming and Planning Model to optimise production sequences and the use of resources.o Design of the capacity plan tool to determine production and human resources strategies in the shortand long term. Configuration and implementation of Navision's MRP IMPS/ FCE modules. Materials, workforce and machine's planning.• Balance of Lines and Work Design in order to increase productivity of the manufacturing cells.The project's achievements at the end of the project a ROI of 1.5to 1 and a projected ROI 12 months after the implementation of 3. 9 to 1.• A 30% increase in personnel's productivity (Payroll vs. Added Value Sales). Measured against thesame product mix.• A 50% increase in efficiency at the lines (use of time, speed and quality).• An 18% reduction in manufacturing expenses associated with production volume accounts (electricpower, miscellaneous consumables, spare parts, safety equipment, consumables and lubricants). Show less
Business Coach
Feb 2016 - Jul 2016Business Coach
Aug 2015 - Jan 2016

Hospital punta pacifica
Aug 2016 - Aug 2016Business coachProcess Analysis to find the different areas of opportunity of the company. Analysis in imaging department (CAT, RX, Sonography, etc) process and statistic trends to find root causes of the main deviations in the service level to the patients.

Banco guayaquil
Aug 2016 - Feb 2017Business coachDevelopment of the "EXPERIENCIA AVANT! Y PREFERENTE" project. The· project focused on optimizing the processes and increasing the profitability of our main client channels. The project's scope covered the Commercial Vice-presidents- P.ersonal and Small Business banking, the Operations department, and the Admissions Risk Assessment department All departments adopted a new work culture which focused on the key market segments through the implementation and design of new work and management systems geared towards improving the client experience. Show less

Mutual de seguridad
Apr 2017 - Dec 2017Senior business coachPatient logisitc cost reduction by Work system improvement. Process and web tools design to measure, control and evaluate the relevance of patient derivation. 10% of cost reduction by improving the relevance evaluation.

P&t software
May 2019 - Oct 2019Full stack software engineerDevelop Software Solutions that helps and adapts to client business and needs.

Amboss
Nov 2019 - Oct 2022Full stack software engineer
Journee
Nov 2022 - nowFull stack engineer
Licenses & Certifications

Lidership coach
London consulting groupJun 2015
Languages
- enEnglish
- spSpanish
- geGerman
Recommendations

Dr. t.j. morgan
President and Director at Morgan Wellness Center and Chix Beach Gym - Pro Bodybuilder and winner of ...Virginia Beach, Virginia, United States
Harsidak singh
B.Tech CSE'2024 || DSA || Software Development || Web DeveloperNew Delhi, Delhi, India
Onpriya sutsamniang
Digital Marketing, Content CreatorBangkok, Bangkok City, Thailand
Kjeld sjaardema
Open for new opportunity'sSchagen, North Holland, Netherlands
Ezra t.
Cybersecurity Analyst L2Lower Hutt, Wellington, New Zealand
Stewan parmar
MBBS Graduate under Maharaja Sayajirao UniversityVadodara, Gujarat, India
Joshua sullivan
Mechanical EngineerDenver Metropolitan Area_Ghouse.webp)
Corina (coco) ghouse
Operations Manager at FedExWP. Kuala Lumpur, Federal Territory of Kuala Lumpur, Malaysia
Dr edel odhiambo
Veterinary Officer- MKWCNanyuki, Laikipia County, Kenya
Stéphane treia
Intervenant en Prévention des Risques Professionnels, Animateur pour les CSE CSSCTAlbertville, Auvergne-Rhône-Alpes, France
...