MithunRaj Muralidharan

Mithunraj muralidharan

bookmark on deepenrich
location of MithunRaj MuralidharanUnited Arab Emirates
Phone number of MithunRaj Muralidharan+91 xxxx xxxxx
Followers of MithunRaj Muralidharan1000 followers
  • Timeline

    Oct 2010 - Mar 2013

    Electrical Engineer

    Sunil and Associates
    Apr 2013 - Sept 2021

    ELVD Project Engineer

    Verger & Delporte Ltd
    Dubai , UAE
    Current Company
    Sept 2021 - now

    BMS Engineer

    Enova by Veolia
  • About me

    BMS Engineer at Enova by Veolia

  • Education

    • R.v.s college of engineering and technology

      2006 - 2010
      Bachelor's degree electrical

      Activities and Societies: Debate team, Symposium head, Cultural society Compeleted B.E in Electrical and Electronics Engineering

    • Bharathiya vidya bhavan

      1994 - 2006
      High school/secondary certificate programs

      Completed Higher Secondary Education

  • Experience

    • Sunil and associates

      Oct 2010 - Mar 2013
      Electrical engineer

       Create detailed Electrical Scheme of the work (including cable size, load requirement earthing size etc) Complete the project within the time Schedule and budget. Develop and maintain knowledge of Cable, Transformer, Generator and Panel board connections. Study the project plans, job contracts , field conditions and the construction drawings. Monitor site activities including installation, commissioning & testing of electrical Equipment, cable laying etc.  Provide assistance for precommissioning /commissioning of constructed facilities and troubleshooting of the same Remain current work knowledge, processes, tools and techniques. Providing work arounds for customer problems. Escalation of critical issues to technical support manager. Show less

    • Verger & delporte ltd

      Apr 2013 - Sept 2021

       Carry out the technical review, approval and process of all technical submittals such as drawings, materials, method statement, work procedures, etc for constructability and code compliance.  Obtaining approval drawings to ensure effective management, including the control of site progress, resolutions of site problems, control of site meetings etc. Carrying out inspections in respect to BMS works carried out for installation and testing and commissioning as per approved drawing and ensures that proper quality is maintained. Involving in the planning of HVAC equipment BMS start up & operational, functional & integration tests and ensuring that all devices are installed before BMS start up. Ensure proper maintenance of site records, inclusive daily site diaries in an approval format and formal monthly progress. Participating in technical co-ordination and progress meetings & site co-ordination discussion with consultant and main contractors. Conveying technical expertise through process analysis, control philosophy and functional specification management responsible for execution as per drawings & design, final validation of system operation. Lead HVAC project operations entailing inspection, testing and commissioning and final handover of HVAC with complete project management accountability. Show less

      • ELVD Project Engineer

        Nov 2014 - Sept 2021
      • Electrical Engineer

        Apr 2013 - Oct 2014
    • Enova by veolia

      Sept 2021 - now
      Bms engineer

      Delivery of legacy, base build correction programs, global assets system testing and commissioning and Assets & Lifecycle Management (ALCM) and construction/fit out projects inclusive of design reviews and engineer of record accountability of the Facility assets.

  • Licenses & Certifications