Christopher Price CEng MIET

Christopher Price CEng MIET

Pre-University Trainee

Followers of Christopher Price CEng MIET834 followers
location of Christopher Price CEng MIETLondon, England, United Kingdom

Connect with Christopher Price CEng MIET to Send Message

Connect

Connect with Christopher Price CEng MIET to Send Message

Connect
  • Timeline

  • About me

    Principal ICT / Telecoms Consultant with Arup Digital Services Portfolio (Buildings, Rail, SISS, Systems Integration) CNIDP

  • Education

    • University of Exeter

      2009 - 2012
      Master of Engineering (MEng) Electronic Engineering 2.1

      Activities and Societies: Expedition Society Windsurfing Society Dancesport Society Climbing Society

  • Experience

    • Arup

      Sept 2008 - Jun 2009
      Pre-University Trainee
    • Arup

      Jul 2010 - Aug 2010
      Vacation Student
    • Arup

      Jun 2011 - Jul 2011
      Vacation Student
    • Arup

      Jun 2012 - Jul 2012
      Vacation Student
    • University of Exeter

      Jun 2013 - Aug 2013
      Technical Staff
    • Arup

      Sept 2013 - now

      HS2 Euston – London Underground Euston and Euston Square Stations, London (2019)As workstream lead within a larger multidisciplinary design team, I led the production of the Communications Concept Design Statements (CDS) for the project. This involved the design of new IP-based Communications systems within new station areas, their system integration with existing systems within the station and the migration of station operations to a new station operations room. The Greater West, UKI led a team to develop GRIP 5 designs for the installation of GSM-R equipment within a number of tunnel complexes on the Greater West Mainline including Newport, Chipping Sodbury and Patchway Tunnels. Oman Botanic Garden, Muscat, OmanAs a member of a multidisciplinary team, I designed and co-ordinated ICT systems for this project during both Developed and Technical Design stages. 1 Triton Square, London, UKChristopher led a small team to produce RIBA Stage F designs for ICT systems for the renovated building including Local Area Network, Structured Cabling and IP telephony systems. Show less Seconded into Hochtief to identify scope gaps in the Telecommunications Stage F design for the new station entrance on Walbrook. Following this, I managed the supply chain to ensure that all telecommunications assets were installed for CCTV, LAN, SCS, PHP, PA/VA and Station Management System (SMS) Alarm systems. I delivered a strategy paper for systems integration for these systems to existing systems within the Bank/Monument Station Complex and agreed this with both LUL. I liaised with LUL and led systems integration team to successfully integrate systems within the new station entrance with Bank/Monument Station. This included, but was not limited to; reviewing method statements and test strategies for onsite testing, witness testing (Site acceptance and site integration) for LAN, Clock, CCTV, PHP, PA/VA, SMS Alarms, and resolution of issues on site. Additionally, I assisted project closeout by delivering MAID documentation for Telecoms. Show less Metropolitan Line Extension (formerly known as the Croxley Rail Link), London, UKAs a member of a multidisciplinary team, I designed and co-ordinated business critical telecom systems for the two London Underground stations on the Croxley Rail Link extension project at the RIBA F1 stage. The work included the design of an IP based Station Data Network, CCTV, Passenger Help Point and Access Control systems. Defence National Rehabilitation Centre, UKI was responsible for producing the Coaxial TV Infrastructure design for several of the buildings within the DNRC Complex. The role involved the finalisation of satellite and aerial positions and orientations to ensure clear line of sight of the horizon and the production of a Coaxial TV Infrastructure performance specification. Show less

      • Principal Engineer

        Nov 2021 - now
      • Senior Consultant

        Apr 2020 - Nov 2021
      • Consultant

        Apr 2015 - Apr 2020
      • Telecommunications / Systems Integration Engineer - Secondment to Hochtief UK Construction

        Jun 2018 - Jan 2019
      • Project Engineer - Secondment to Network Rail

        Jun 2017 - Sept 2017
      • Assistant Project Engineer - Secondment to London Underground

        Jun 2016 - Dec 2016
      • Graduate Consultant

        Sept 2013 - Apr 2015
  • Licenses & Certifications