Mohammad Effendy Abdul Rahman, PMP®

Mohammad effendy abdul rahman, pmp®

bookmark on deepenrich
location of Mohammad Effendy Abdul Rahman, PMP®Federal Territory of Kuala Lumpur, Malaysia
Phone number of Mohammad Effendy Abdul Rahman, PMP®+91 xxxx xxxxx
Followers of Mohammad Effendy Abdul Rahman, PMP®255 followers
  • Timeline

    Jan 2002 - Aug 2003

    Civil Design Engineer

    HLA Associates Sdn Bhd
    Sept 2003 - Sept 2004

    Project Engineer

    CyEn Sdn Bhd
    Sept 2004 - Oct 2006

    Civil Engineer

    Shimizu Corporation
    Nov 2006 - Dec 2009

    Project Manager/Design Coordinator

    Perunding Kejuruteraan RAR
    Jan 2010 - Dec 2011

    Manager (Civil and Structure)

    KLIA Consult Sdn Bhd
    Nov 2011 - Nov 2012

    Senior Engineer

    KLCC Projeks Sdn Bhd
    Nov 2012 - Nov 2013

    Project Manager

    Port of Tanjung Pelepas
    Dec 2013 - Jun 2016

    Vice President III (Manager)

    AlloyMtd Group
    Jun 2016 - Apr 2022

    Senior Manager, CEO Office

    Ranhill Bersekutu Sdn Bhd
    Kuala Lumpur, Malaysia
    Jun 2022 - Feb 2023

    Senior Manager, Project Management Unit

    Ranhill Bersekutu Sdn Bhd
    Current Company
    May 2023 - now

    Engineering Advisor

    Freelance
  • About me

    Project Management & Control, Technical Advisory, Business Development & Strategy

  • Education

    • Universiti teknologi mara

      1996 - 1999
      Diploma in civil engineering civil engineering second-class (upper division)

      Activities and Societies: Faculty's Rugby team

    • Universiti teknologi mara

      1999 - 2001
      Bachelor of engineering (b.eng.) civil engineering second-class honours (upper division)

      Activities and Societies: Manager / player for the Faculty's Rugby team

  • Experience

    • Hla associates sdn bhd

      Jan 2002 - Aug 2003
      Civil design engineer

      Responsible in the civil (infrastructure) design, preparation of tender and contract documents and attending design matters during construction stage; and Liaise with relevant local authorities and utility provider in obtaining requirements and subsequently coordinate design proposal submission for approval.

    • Cyen sdn bhd

      Sept 2003 - Sept 2004
      Project engineer

      Liaise with Consultants during the design stage and construction stage; Manage and monitor the physical works during construction ensuring full compliance with construction drawings, technical specification and within the approved schedule; Resolve any drawing/specification discrepancy before or during physical work at site; Review sub-contractor’s proposed works methodology prior submission to consultant; Monitor and supervise tests (on-site/factory) as required by consultant/contract for approval; and Review and verify sub-contractor’s monthly progress claim; Liaise with the material supplier (tender calling, tender evaluation, product compliance and delivery schedule). Show less

    • Shimizu corporation

      Sept 2004 - Oct 2006
      Civil engineer

      Involved in the construction stage for two (2) out of five (5) sites i.e. Puchong Sewage Treatment Plant (150,000 PE) and South Klang Valley Centralised Sludge Treatment Facility under Jabatan Perkhidmatan Pembentungan (JPP) Malaysia (with total project value of USD156million); Manage and monitor the physical works during construction ensuring full compliance with construction drawings, technical specification and within the approved schedule; Monitor progress of physical works and report to Project Manager on daily/weekly basis; Resolve any drawing/specification discrepancy before or during physical work at site; Review subcontractor’s proposed works methodology prior submission to consultant; Monitor and supervise tests (on-site/factory) as required by consultant/contract for approval; Review and verify subcontractor’s monthly progress claim; and Liaise with the material supplier in terms of product compliance and delivery schedule. Show less

    • Perunding kejuruteraan rar

      Nov 2006 - Dec 2009
      Project manager/design coordinator

      Manage and coordinate the preparation of tender documents (technical and contract); Liaise with all relevant parties (clients, consultants, local authorities, utility provider, end user) in obtaining the requirements of each project; Prepare the Term of Reference (TOR), tender documents and tender evaluation for Clients; Manage and coordinate site staff during construction stage ensuring compliance with design, technical specification and contract; Oversee physical works and progress during construction stage; Review and approved proposed method statements and material submission by contractor; Review contractor’s claim with respect to site progress and contract; Attend monthly site meeting and internal site meetings; and Liaise with local authorities and utility provider throughout the project handover exercise. Show less

    • Klia consult sdn bhd

      Jan 2010 - Dec 2011
      Manager (civil and structure)

      Manage and monitor the preparation of tender documents by the technical consultant with respect to time, cost, quality (technical and contractual); Liaise with all relevant parties (clients, consultants, local authorities, utility provider, end user) in finalizing the specific requirements for the project; Review and approve proposed design by technical consultant and counter propose value engineering solution when necessary; Advice client on any critical issues that need urgent attention and resolution; and Prepare and coordinate the monthly progress report to the client. Show less

    • Klcc projeks sdn bhd

      Nov 2011 - Nov 2012
      Senior engineer

      Managed two (2) projects on under the East Coast Economic Region (ECERDC) development; Manage the Engineers and Builders on site in terms of progress, quality, safety and cost; Liaise with local authorities/agencies on matters pertaining with projects; and Prepare and submit all required reports/documents as per Client's requirement and Company policy.

    • Port of tanjung pelepas

      Nov 2012 - Nov 2013
      Project manager

      Managed two (2) projects worth approximately USD65million with Port Tanjung Pelepas; Monitor the Engineers and Builders and ensuring works are executed in accordance with the contract (quality, time, cost and safety); and Report directly to the Head of Development on project status (daily/weekly/monthly)

    • Alloymtd group

      Dec 2013 - Jun 2016
      Vice president iii (manager)

      Responsible in managing and coordinating all works between KL Office and Operation Office in Kingdom of Saudi Arabia (KSA) and Oman; Based in KL Office with occasional travelling to KSA and Oman as and when required; Monitor the Project Team in KSA and provide technical and contractual advise when required; and Prepare the Board/Management Committee report for stake holders approval.

    • Ranhill bersekutu sdn bhd

      Jun 2016 - Apr 2022

      Business Development and Operation Stakeholder Manager for MyHSR project Business Development for multi disciplinary engineering firm

      • Senior Manager, CEO Office

        Aug 2018 - Apr 2022
      • Technical Director, Transportation Division

        Apr 2017 - Jul 2018
      • Deputy Division Director

        Jun 2016 - Apr 2017
    • Ranhill bersekutu sdn bhd

      Jun 2022 - Feb 2023
      Senior manager, project management unit

      Lead the Project Management Unit

    • Freelance

      May 2023 - now
      Engineering advisor

      • Project Management • Project Control • Project Troubleshooting • Civil Infrastructure Construction • Contract Management • Design Engineering Management • Stakeholder Management • Contract Negotiation • Quality Assurance • Business Strategy

  • Licenses & Certifications

    • Project management professional (pmp)®

      Project management institute
      Dec 2020
      View certificate certificate