    May 1997 - May 1998

    Supervisor

    Saga engg.
    May 1998 - Jun 1999

    Project Assistant

    Reliance Industries Limited
    Jul 1999 - Sept 2000

    Assistant Engineer

    Syscon engineers pvt ltd.
    Oct 2002 - Dec 2002

    Assist. Engg.

    Allied Engg.co.
    Jan 2003 - Dec 2004

    Jr. technician

    Birla Copper LTD.
    Dec 2004 - Mar 2007

    Jr, Engg,

    GUJARAT MINERAL DEV CORP LTD
    Current Company
    Mar 2007 - now

    Manager

    Reliance Industries Limited
  • About me

    Manager at Reliance Industries Limited

  • Education

    • Im & e ghandhinagar

      -
      Exempted from exam. of electrical supervisor electrical exempted
    • Gujarat state technical examination board

      1994 - 1997
      Diploma elactrical engineering electrical/electronics maintenance and repair technology first class
    • Gujarat state technical examination board

      1991 - 1993
      Electrical service technician electrical/electronics maintenance and repair technology first class
  • Experience

    • Saga engg.

      May 1997 - May 1998
      Supervisor

       Knowledge of testing of LT motors and assembly of LT motors

    • Reliance industries limited

      May 1998 - Jun 1999
      Project assistant

       Posted at Refinery Tank Farm for Testing, Commissioning, Operation and maintenance of power x’mers up to20 MVA Here I have Carried out Erection, Testing and commissioning of LT/HT motors, MCC, PCC,HT Panels , UPS.  Preventive maintenance brake down Maintenance shut down jobs of 6.6 kV Panels, motors up to 3 MW, PMCC. MCC, Heaters, Batteries, Battery charger, UPS.  worked on flame proof Equips. Heat tracing and cathodic protection of Piping Connected for the training of power system protection, Electrical module1-2, L&T Switch gears Fire fighting and Safety.  Identify faults, repair and return equipment to normal operation. To prepare PTW based on the periodic PM job plans Show less

    • Syscon engineers pvt ltd.

      Jul 1999 - Sept 2000
      Assistant engineer

       250MW Thermal Power Plant Equipment’s maintenance.220 KV Switch Yard Equipments Maintenance.  Preventive maintenance of x’mers up to 150MVA,HT/LT motors , 6.6 KV Panels, MCC, PCC, HT Panels, ACB, VCB, SF6 circuit breakers, Batteries and battery Chargers.  Involved actively in shut down of power plant, HT panels, MCC,PCC and x,mer up To 150MVA and Electro static precipitator.  supervise and participate in preventive, corrective and troubleshooting maintenance, and testing of all High and Low Voltage plant electrical equipment and shutdown activities 125mw alternators of BHEL. Preventive maintenance.6.6kv board, drawings and Trouble shooting. Show less

    • Allied engg.co.

      Oct 2002 - Dec 2002
      Assist. engg.

       It is 50 years old company which is involved in rewinding and repairs of all kind of Industrial electrical equipments and authorized service center of M/S Compton Greaves, Siemens Ltd., Kirlosker, ABB, Jyoti Ltd., and Reliance Elect. Co. USA, Teco Elect. Ltd. Taiwan.  Repair’s , Rewinding, Maintenance and Testing of HT/LT motors, DC motors, x’mers, Up to 2000KVA, Generator up to 2270KVA, LT Panels and Switchgears.  Responsible for availability of Good & safe to use proper tools, spares, consumables and correct use of various types of electrical equipment and PPE Knowledge of rectifier units, frequency converter, battery chargers,  Involved in Overhauling, commissioning and trouble shooting of motors and x’mers.  Repair, overhauling, testing of alternators up to 2270kva. Alignment of alternators With rigid coupling.  Also responsible for trouble shooting at site as a service engineer Of HT/LT motors, Generators, x’mers. Show less

    • Birla copper ltd.

      Jan 2003 - Dec 2004
      Jr. technician

       Posted at Phosphoric Acid Plant, Di Ammonium Phosphate Plant and Jetty with 26 ton grab unloader and 3.5 km long pipe conveyor Elect. Equip. Maintenance and operation.  Actively involved in commissioning of New Sulphuric Acid Plant 3.3KV panels, HT LT motors, Variable freq. drives and 26 ton grab unloader at jetty with its electrical auxiliaries and 500kw motor with Working on Variable frequency drives of CEGLEC Make and ABB make.  Operation and Maintenance HT/LT motors, Power and Distribution x’mer, DC motors up to 125 kW.  Preventive maintenance brake down Maintenance shut down jobs of 11 kV, 3.3 kV Panels, Slip ring motors up to 500 kW, PMCC. MCC, Heaters, Batteries, Battery charger, UPS.  Look after Sub station activity also working with work permit system and knowledge of hazardous area.  comply with company Health, Safety and Environment Management System(HSE-MS)also promote awareness of its use among the staff. To perform overhauling of Motors, test and calibration of test equipment. Show less

    • Gujarat mineral dev corp ltd

      Dec 2004 - Mar 2007
      Jr, engg,

       Responsible for commissioning, Operation and maintenance 250 MW Thermal power plant(CFBC Boiler) with Guj.grid connected by 100km long 220KV over head lines and substation and switch yard activity coordination with load Dispatch center of Guj. Elect. Board. .supervise the electrical technicians and contractors. Commissioned CVT,IVT,SF6 Circuit Breakers 1600A,LA,PLCC, wave trap, Line Diff. relay like GE make D60, 170 MVA transformers.6.6KV sub station Activity.  Conditioning, monitoring, maintenance of Alternator 125MW ANSALDO make and DG set 625*2 KVA, Also knowledge of Electro static precipitator. Working on 6.6 KV drawings and modification . preventive, routine and breakdown maintenance activities of HT/LT motors, transformers, PCC, MCC, micro Processor based relays like 7SJ 600, & 7SJ 61 to 64 of Siemens. Air Ckt.Bkrs.vaccume Ckt., earthing, Heat tracing.  Implement, in consultation with Electrical Section Head / Electrical Engineer, planned shutdowns, utilize available manpower & issue required materials. Connected training for 6.6 KV Vacuum Circuit Breakers of Siemens at Mumbai Unit. Show less

    • Reliance industries limited

      Mar 2007 - now
      Manager

      Over 16+ years of experience in Electrical commissioning, Maintenance, trouble shooting as well as Operation in Thermal and Gas based Power plant in the manufacturing industry as well as oil and Gas.  Managerial assignment in Electrical system management (Commissioning / Operation / Maintenance) with leading organizations. supervise the electrical technicians and contractors.  I have also acquired in depth knowledge of Testing of system of commissioning activity.  Skilled and experienced in the Electrical Projects, Project implementation, Execution, Engineering, Operation and Maintenance of various Electrical equipments associated with Power Plant.  Plan the remedial actions to system fault in troubleshooting of electrical equipment, including participating in the diagnosis and repair of major fault and equipment breakdown.  Electrical schematic drawing studies and problem solving.  Planning & implementing preventive and corrective maintenance procedures, Major shutdown jobs, and annual shutdown planning, troubleshooting actual and potential problems areas and implementing viable solutions.  Have full understanding and the application of HSE, OHSAS, HIRA and ISO-9000 and 14001 systems.  Testing, Commissioning, maintenance of 33KV( 8DA 10) Double Bus bar ,Siemens make Gas Insulated Switch Gears.  Successfully reviewing SLDs of HT & LT systems, schematic circuit drawings of the HT (33KV & 6.6 KV, Siemens) switchboards and LT (415 V, L & T) switchboards, protection schemes in HT, LT systems ,PCC,MCC etc. Successfully commissioned 220kv Siemens switchyard with one and half breaker scheme Show less

  • Licenses & Certifications

    • Electrical supervisor

      Gujarat government
      Dec 1999