ABDERRAHIM Younes

Abderrahim younes

bookmark on deepenrich
location of ABDERRAHIM YounesOued Lakhdar, Tlemcen, Algeria
Phone number of ABDERRAHIM Younes+91 xxxx xxxxx
Followers of ABDERRAHIM Younes17000 followers
  • Timeline

    Dec 2014 - Mar 2018

    Deputy Quality Manager

    Entrepose Group
    Chlef
    May 2018 - Dec 2020

    Quality Manager

    Entrepose Group
    Mar 2021 - Jun 2021

    Quality Manager

    ENGCB
    Aug 2021 - Sept 2022

    Mechanical QC

    Larsen & Toubro
    Sept 2022 - Nov 2022

    Quality Manager

    MERI
    Current Company
    Nov 2022 - now

    Quality Specialist

    Cameron, a Schlumberger company
  • About me

    Quality Specialist @ Cameron | Six Sigma, Mechanical Engineering

  • Education

    • Tema institut - technology & management

      2019 - 2019
      Training - project management with simulation
    • Irca training school

      2018 - 2018
      Iso 9001 version 2015

      The transition from ISO 9001 2008 to ISO 2015 and the difference between the two versions .

    • Irca training school

      2019 - 2019
      Iternal auditor : iso 19001 v 2011
    • Sibawaih school

      2013 - 2014
      Level 11 of 12 english
    • C.f.p.a chetouane - tlemcen

      2014 - 2014
      Computer science certification (6 months) computer science
    • Abou bekr belkaid university of tlemcen

      2013 - 2014
      C.e.i.l english conversation english
    • East carolina university

      2013 - 2014
      Cerificate of completion english "global understanding"
    • Abou bekr belkaid university of tlemcen

      2008 - 2014
      Master's degree mechanical engineering option : energy engineering

      Activities and Societies: Sonatrach Hassi R'mel : Internship, 15 days 2012. (Turbo-machines) Sonatrach Hassi R'mel : Internship, 15 days 2013.(Compressors)

  • Experience

    • Entrepose group

      Dec 2014 - Mar 2018

      • In addition to the Missions mentioned in the previews projects with the position of Deputy Manager comes more responsibilities:-Maintain the good function of the quality department by giving each member of the team his area of action by qualification and specialty in another term put the right guy at the right position (Welding, Mechanical, Steel structure…)-Implant and encourage the quality spirit into all the workers by programming sensibilization meetings to emphasize about the importance of the quality and the respect of procedures.-Preparation of Welding Procedure Specifications (WPS) , Procedure Qualification Record (PQR)-Preparation of Procedures: Visual test procedure, Penetrant Test Procedure, Ultrasonic Test procedure, Bolts tightening procedure.-Prepare for the quality audits by keeping all the registers updated and the application of the quality procedures both on offices (Folders, PVs…) and at site’s Working and storage Areas. -Monitor the ECME Register and ensure that all the Measurement equipment are calibrated and conform. -Planning of quality inspections along with the NDT’s Inspections.-Preparation of Method statements for the equipment (pre-assembly and erection) in collaboration with the construction supervisors. Show less Missions -Ensure the strict respect of the quality procedures and our quality policy.-Supervise the quality inspections as per the ITPs (QCPs) and prepare their respective reports.-Detect non-conformities and propose corrective actions and ensure its closer, and issue an action plan if necessary to avoid any similar defects.-Supervise and make the necessary preparations to preformed Piping “Hydro & pneumatic Tests”.-Prepare the equipment’s Final folder and ensure the closers of all the items in the punch lists. Show less

      • Deputy Quality Manager

        Jan 2016 - Mar 2018
      • QA/QC Engineer

        Dec 2014 - Jan 2016
    • Entrepose group

      May 2018 - Dec 2020
      Quality manager

      - WPS and PQR preparation (Piping – Tanks- steel structure) as per standards (ASME-AWS) - Project quality procedures preparation (Mechanical-steel structure – piping-painting- E&I)- Quality project risk assessment elaboration and mitigation plans - Monitor quality KPIs and establish action plans- Monitor Welding quality and organize periodic sensitization for worker- Monitor NDT progress and backlog situation- Preparation of all the project measuring equipment and monitor the calibration dates- Monitor NCRs and prepare corrective and preventive actions- Final Documentation and Mechanical completion Show less

    • Engcb

      Mar 2021 - Jun 2021
      Quality manager

      Client : Petrofac International (UAE) LLC / SONATRACHProject: Tinrhert field development project- Ohanet - Pipeline and surface facilitiesDescription:collection network 36 wells including all surface facilities required for wellheads and manifoldsPipeline : 376 kmSurface facilities : 36Manifolds : 10VBS : 04Jonction: 01

    • Larsen & toubro

      Aug 2021 - Sept 2022
      Mechanical qc

      Project: SOUTH WEST GAS FIELDS DEVELOPMENT PROJECT, Realization of Gas Treatment Units -HTJ (EPC 2 – Phase 1)Client: SONATRACH- Quality procedures preparation and revision of project ITPs- Check materials datasheets and conformity as per project specification and approve MAR accordingly - Coordination with Authorities (ARH – DME) for procedures approval and hydrotests witness- Internal quality audits for subcontractors to insure the respect and implementation of project quality procedures and project specifications- RFC (Release for commissioning) folders checking to ensure that all inspections have been done and records available and approved- Project material inspections:• Check that the received shipment is as per the packing list and invoice• Confirm that the supplied equipment are according the project specifications, datasheets and drawings• Check the preservation status as per the vendor requirements and the presence of any damages- Equipment inspections: conduct all inspection as per the approved latest revision of the ITP• Packages and static equipment: (vertical and horizontal)• Rotating equipment: (Gas turbine generators and Compressors, Pumps, Turbo-Expander)• Overhead cranes • Tanks• Insulation (Hot and Cold) and Painting - Steel structure inspections - Piping Inspections:• Holiday test for underground piping • Mechanical clearance and test packages release for testing - Release for commissioning walkdown and raise punch point and follow-up their closure Show less

    • Meri

      Sept 2022 - Nov 2022
      Quality manager
    • Cameron, a schlumberger company

      Nov 2022 - now
      Quality specialist
  • Licenses & Certifications