WAHED REHAN -M.Eng.(HVAC).PMP®.

WAHED REHAN -M.Eng.(HVAC).PMP®.

MECHANICAL ENGINEER

Followers of WAHED REHAN -M.Eng.(HVAC).PMP®.2000 followers
location of WAHED REHAN -M.Eng.(HVAC).PMP®.Hyderabad, Telangana, India

Connect with WAHED REHAN -M.Eng.(HVAC).PMP®. to Send Message

Connect

Connect with WAHED REHAN -M.Eng.(HVAC).PMP®. to Send Message

Connect
  • Timeline

  • About me

    Projects Manager(BDU) - MEP@Abraj || Ex-Jacobs || Ex-Parsons|| Ex-ABV Rock Group

  • Education

    • Govin Academy - Singapore - An Alumni of IIT & IIM professors

      2020 - 2021
      Executive Programme in Management Project Management
    • STATE BOARD OF TECHNICAL EDUCATION & TRAINING

      1999 - 2002
      Associate's degree Mechanical Engineering First
    • Jawaharlal Nehru Technological University

      2002 - 2005
      B.Tech Mechanical Engineering First
    • Jawaharlal Nehru Technological University

      2011 - 2014
      M.Tech Heating Ventilation & Air Conditioning 76% with Distinction.
  • Experience

    • AL MUTAWA & SON'S GROUP

      Jul 2007 - Jun 2008
      MECHANICAL ENGINEER
    • Zoom Emirates Electromechanical LLC.

      Oct 2008 - Apr 2010
      MECHANICAL ENGINEER
    • ABV Rock Group

      Jun 2010 - Jun 2014
      MECHANICAL PROJECT ENGINEER

      EPC Transportation of Treated Water from Taif to Ma’aden Gold Mine SiteNov 2011 - Mar 2014Client : Saudi Arabian Mining Company (MA’ADEN GOLD)Nature of the Project: The Primary purpose of this project is to convey treated effluent from existing Sewage Treatment Plant at Taif to Ad- Duaihi Mine Site through pipeline, which is approximately 420kms. Package-1: It consist of Transfer pump station inclusive of all facilities with fence and operation building, SEC room, interconnecting piping and fittings, pumps, 71 km pipeline and Instrument installation up to nozzles of water storage tanks at Master pump station, pressure-reducing valves, Surge relief valves, HVAC, Plumbing, Electrical, Instrumentation, Communication FOC installation and necessary coordination. Package-2: It consist of Master pump station inclusive of all facilities with fence, office building and pump cable house building, Guard house, SEC room, interconnecting piping and fittings, pumps, 233 km pipeline and Instrument installation, Surge relief valves, HVAC, plumbing, electrical, Instrumentation, Communication network installation and necessary coordination. Package-3: It consist of Ad-Duaihi storage facility inclusive of all facilities with fence, Operation building and Generator Room, Guard house, interconnecting piping and fittings, pumps, 116 km pipeline and Instrument installation, pressure reducing valves, surge relief valves, HVAC, Plumbing, electrical, Instrumentation, Communication network cable installation and necessary coordination Show less

    • Parsons Corporation

      Aug 2014 - Feb 2016
      MEP Engineer - Project/Construction Management

      Technical Review of Shop Drawings,Technical Review of Material Submittals,inspecting approved materials,and inspection of site works etc...

    • Jacobs

      Oct 2016 - Jun 2020
      Sr.Mechanical Engineer - Project/Construction Management.

      Review & Approve Shop Drawings(External Infrastructure works like Potable water network with Pumping Station,WO & ARV Chambers,Fire Station (HVAC,PLUMBING,FIRE (Sprinklers system,FM200,FOAM suppression etc,LPG System,Pumping Station)). Review & Approve Material Submittals,inspecting approved materials,and inspection of site works etc...

    • Abraj Design Solution Pvt. Ltd.

      Sept 2020 - now
      Projects Manager - BDU
  • Licenses & Certifications

    • MEMBER

      Construction Management Association of America (CMAA)