Mustafa Mümin Küçükçiloğlu

Mustafa mümin küçükçiloğlu

bookmark on deepenrich
location of Mustafa Mümin KüçükçiloğluAtyrau Region, Kazakhstan
Phone number of Mustafa Mümin Küçükçiloğlu+91 xxxx xxxxx
Followers of Mustafa Mümin Küçükçiloğlu1000 followers
  • Timeline

    Nov 2002 - Mar 2004

    Civil Supervisor

    Dom Yapı Üretim Ltd. (Main Contractor Silkar Construction), Antalya (Turkey)
    Apr 2004 - Nov 2006

    Civil Supervisor

    IC İçtaş Construction, Antalya (Turkey)
    Feb 2008 - Dec 2010

    Civil Engineer (Kazan City Stadium )

    Monotek Construction
    Jan 2011 - Oct 2011

    Civil Engineer (Green Valley Villages Project / Construction)

    Gri-Mavi Construction (Main Contractor Dia Construction), Baku (Azerbaijan)
    Nov 2011 - Nov 2012

    Civil Engineer (Hydroelectric Power Plant)

    Gri-Mavi Construction (Main Contractor İçtaş Construction), Tokat Niksar (Turkey)
    Feb 2012 - Apr 2013

    Civil Engineer ( Gas Plant )

    TEKFEN Construction & Installation Co., Inc. Galkynysh Gas Field Development Project, Yoloten (Turkm
    Apr 2013 - Mar 2014

    Civil Engineer

    TEKFEN Construction & Installation Co., Inc. SADARA Propylene Oxide Project, Jubail (Saudi Arabia)
    Apr 2014 - May 2015

    Quality Control Engineer

    ENKA
    May 2015 - Mar 2020

    Project Lead QA&QC Engineer

    Bechtel-Enka Joint Venture
    Kazakhstan
    Aug 2020 - Mar 2022

    QA&QC Manager

    ENKA İnşaat ve Sanayi A.Ş. Engineering for a better future
    Jun 2022 - Aug 2024

    Project Quality Manager

    Bechtel-Enka Joint Venture
    Kazakhstan
    Current Company
    Oct 2024 - now

    Project Quality Manager

    ENKA İnşaat ve Sanayi A.Ş. Engineering for a better future
  • About me

    Project Quality Manager at ENKA İnşaat ve Sanayi A.Ş. Engineering for a better future

  • Education

    • Süleyman demirel üniversitesi

      -
    • Казанский государственный архитектурно-строителный университет

      -
      Civil engineer
  • Experience

    • Dom yapı üretim ltd. (main contractor silkar construction), antalya (turkey)

      Nov 2002 - Mar 2004
      Civil supervisor

      Structural Masonry (Concrete and Rebar Works.)Architectural Works such as ; undercoat plaster, coarse plaster, finishings, Painting, Plasterwork, Plaster Finish, Gypsum Plaster. Wood Construction (Strip, Wooden Footbridge, Wood Paneling) Paving Works.

    • Ic i̇çtaş construction, antalya (turkey)

      Apr 2004 - Nov 2006
      Civil supervisor

      Structural Masonry and Precast Bridge (Concrete and Rebar Works )Architectural Works such as ; undercoat plaster, coarse plaster, finishings, Painting, Plasterwork, Plaster Finish,Gypsum Plaster, Aluminium panel, Acoustical Panel, Glass Wool instalation, FaceWall, Mechanical Face Work (Cladding), Space Deck.Wood Construction (Strip,WoodenFootbridge, Wood Paneling). Paving Works.

    • Monotek construction

      Feb 2008 - Dec 2010
      Civil engineer (kazan city stadium )

      Structural Masonry (Concrete and Rebar Works.) Architectural Works such as ;undercoat plaster, coarse plaster, finishings, Tile Cladding Paving Works. Steel Roofing.

    • Gri-mavi construction (main contractor dia construction), baku (azerbaijan)

      Jan 2011 - Oct 2011
      Civil engineer (green valley villages project / construction)

      Concrete and Rebar Works for 24 Villages which is located in Baku. 24 Villages Structural Masonry (Concrete and Rebar Works.)Architectural Works such as ; undercoatplaster, coarse plaster, casing, finishing. Paving and Fence Wall. Preparation invoice and Final accounts.

    • Gri-mavi construction (main contractor i̇çtaş construction), tokat niksar (turkey)

      Nov 2011 - Nov 2012
      Civil engineer (hydroelectric power plant)

      Management of Central Building and 11 km concrete transportation canal. Structural Masonry (Concrete and Rebar Works.) Supervising of spillway. Architectural Works such as ; undercoat plaster, coarse plaster, finishing.

    • Tekfen construction & installation co., inc. galkynysh gas field development project, yoloten (turkm

      Feb 2012 - Apr 2013
      Civil engineer ( gas plant )

      Oil and Gas and Commercial Development project facilities on a multi discipline construction design, EPC Project and Administrative management, supervision, inspection and different operational department.Direct reporting to the Project Senior General Construction Manager, PMC Manager, Field Engineering Manager and Turn over Manager. Coordinate with other Discipline Managers, Construction Managers, Area Superintendent and Interface Management for client.Assumed responsibility for site supervision of construction activities to achieve scope of twenty (24) buildings in coordination of the subcontractor. Ensure subcontractors supervise their scope and undertakes the works with their respective contractual obligations and Safety and Environment (SHES) , Quality, Schedule and Cost requirements with a focus of an Incident and Injury Free environment. Enforced the SHES (Safety Department) action with participation to Weekly and Building Walk down with all team leaders. Show less

    • Tekfen construction & installation co., inc. sadara propylene oxide project, jubail (saudi arabia)

      Apr 2013 - Mar 2014
      Civil engineer

      Saudi Aramco and the Dow Chemical Company, the leading specialty materials company in the world, have formed the Sadara Chemical Company (Sadara), a joint venture that will construct, own and operate a world-scale integrated chemicals complex in Jubail Industrial City II, in the Eastern Province of the Kingdom of Saudi Arabia.With an overall 6 months of experience in Propylene Oxide Project facilities on a multi discipline construction design,supervision, inspection and follow up subcontractors at side.Attend meetings withmanagers of the PMT (Project Management Team). Also according to the business plan decision with them.Otherwise preparing daily reporting to the Construction Managers. Ensure subcontractors supervise their scope and undertakes the works with their respective contractual obligations and Safety and Environment (SHES) , Quality, Schedule and Cost requirements with a focus of an Incident and Injury Free environment. Show less

    • Enka

      Apr 2014 - May 2015
      Quality control engineer

      Since Enka has a long-term commitment in the Russian commercial real estate market, a decision was made to redevelop its existing shopping malls. The shopping mall "Kapitoly-Kuntsevo," which was put into operation in 1997, is the first to be newly constructed as a mixed-use project.The owner, Enka TC, awarded the contract for the re-development project to Enka Construction in April, 2011. The existing shopping center, comprising an area of 19,400 m2, will be demolished and rebuilt as a modern shopping center with a net leasable area of 62,500 m2, and with 4,500 m2 of office space, a 16,500 m2 residential center and a car park with a capacity for 2,000 cars. It will have a building area of approximately 242,000 m2. Show less

    • Bechtel-enka joint venture

      May 2015 - Mar 2020

      The CSG2 main facility will occupy an area of approximately 39 hectares.CSG2 will be equipped to increase the pressure of the gas to be transported over the mountains to the PRMS in the 42” SCP pipeline. Construction of CSG2 facility and lay-down areas will avoid building on the larger area of wetland at the site. Gas compression;Each compressor station is required to generate 66MW of power to compress the gas when the pipeline is operating at its maximum throughput. The compressor stations will have four trains of gas compressors driven mechanically by dry low emission (DLE) gas turbines (D5-019) fuelled by gas that has been taken from the SCP pipeline and has passed through a pressure reduction package. Each gas turbine will have an ISO-rated power output of 30MW and an exhaust height of 20m. The turbines will be sized appropriately to aim to operate within their low-NOx operating range for as much of the year as reasonably practical when considering ambient temperature variation and variation in pipeline throughput (D5-097). The compression trains are designed to compress the gas to approximately 90 barg and aftercoolerswill be needed to cool the compressed gas to a maximum of 34°C.Compressed gasfrom the operating compression trains will co-mingled and sent to the PRMS via the 42”SCP export pipeline. Facility Access Road: In order to expand the capacity of the existing South Caucasus Pipeline (SCP) gas pipeline system a pipeline loop is to be installed with two new compressor stations in Georgia. The Second of these compressor stations (CSG2) is at Tsalka, in the highlands of Georgia, approximately 120 km south of Tbilisi.A new access road is required to CSG2 as part of SCP Expansion Project. This road will provide access both during construction and throughout the operation of CSG2.As part of the design, the Scope of Work required for implementation of the access road shall be provided. Show less

      • Project Lead QA&QC Engineer

        Jul 2018 - Mar 2020
      • Project Lead QA&QC Engineer

        May 2015 - Jul 2018
    • Enka i̇nşaat ve sanayi a.ş. engineering for a better future

      Aug 2020 - Mar 2022
      Qa&qc manager
    • Bechtel-enka joint venture

      Jun 2022 - Aug 2024
      • Project Quality Manager

        Feb 2023 - Aug 2024
      • Deputy Quality Manager

        Jun 2022 - Feb 2023
    • Enka i̇nşaat ve sanayi a.ş. engineering for a better future

      Oct 2024 - now
      Project quality manager
  • Licenses & Certifications

    • Industrial radiation&protection ways training

      İmkosan kalite kontrol ticaret a.ş.