
Timeline
About me
Project Manager at ERITH CONTRACTORS LIMITED
Education

De la salle downpatrick
1982 - 1987
Experience

F moore contracts
Jan 1998 - Feb 2003Business ownerBusiness OwnerResponsible for smooth and effective running of all aspects of business specialising in masonry; overseeing of procurement of work; completion of contracts, management of safety and safe practices of work; purchase of material, sourcing of sub-contractors; erection and maintenance of regular and complex masonry structures; repair and maintenance of masonry, brickwork and block work structures and small, complete projects on price and schedule

S&f moore ltd
Jan 2003 - Aug 2011DirectorDirectorThe company completed various projects on rail, construction, social and private buildings as a specialist masonry and construction contractor. The company activities included the management of sub-contractors, quality control, and health & safety assurance checks. I was responsible for the implementation, planning and logistics of all operations. Following the procurement of work and management of various packages, I continually developed and maintained positive and effective working relationship with clients and PCs, many of which I worked for on many different projects over a long period of time. Show less

Amey rail limited
Oct 2005 - Jul 2019Constuction project managerI lead a team to successfully deliver multiple packages of work including line side Civils, structures and all ancillary works on behalf of OLE England . I managed up to nine packages running concurrently utilising specialist contractors and a workforce of over 200 operatives to deliver a quality product while achieving best engineering value for the clients on or a head of program .we achieved this by using forward thinking and industry knowledge while bring in and using the latest methods and products available to the project . In doing so the project team was nominated and won multiple awards and recognition from peers , some of the processes have now been adopted as best practices by Network Rail . Show less

Mc ginley infrastructure projects
Aug 2011 - Aug 2012General foremanGeneral Foreman T3iB Building Heathrow Airport £85mI oversaw delivery of various civils and concrete packages of works with a direct labour and subcontract specialist work force. As shift manager I acted as the interface between the client and BAA, representing McGinley’s at progress and planning meetings. I worked in conjunction with the Programme Manager and Works Manger to develop an achievable programme of works that achieved both the client’s aspirations and expectations.

Ferrovial airports
Aug 2012 - Oct 2013Section managerSection manager for T2B Stands and Taxiways £1.3bnAs part of the senior management team I oversaw the onsite delivery of two sections of the works, all of which while Heathrow was fully operational and without interrupted passenger operations. Working on very constrained areas, that where constantly moving in conjunction and integrated with other PC works in line with the master programme for the whole terminal project. I managed multiple elements of heavy civil engineering going on at the same time from deep drainage ,high pressure fuel and water main installation ,concrete works, and large scale earth works .I was in control of all the planning and resourcing all of the labour and plant for the sections under my control .I managed all specialist subcontractors and the smooth intergradation and collaboration of all parties for a safe and efficient site. Show less

Volker fitzpatrick
Jan 2013 - Oct 2015Construction manager ,senior site manager ,general foremanconstruction manager, senior site manager, general foreman £630mI progressed through different roles and managed various challenging packages off works for Volker Fitzpatrick in many different environments from 2 fully operational depots in central London, earthworks projects in SSSI sites in the Essex countryside and the completion of the Ipswich Cord Project in the center of Ipswich while working at full operational capacity. I Supported the Programme Manager in attendance at interface meetings with NR, designers and other rail clients. My team won a gold green apple award and was recognized by the different environmental agencies for our outstanding environmental approach and management while working in a SSSI site. We also received a letter of recognition from the ORR for the management and processes we put in place while working on that site. Show less

Erith contractors limited
Jun 2019 - nowProject Manager on multi discipline project
Construction Project Manager
Jul 2019 - nowProject Manager
Jun 2019 - now
Licenses & Certifications

Nvq level 3 trade
Citb
Tempory works coordinator
Citb
Nvq level 7
CitbOct 2015
Personal track safety
Network rail
First aid
American red cross training services
Scaffold apreciation
Hss training
Asbestos awareness
Erith training limitedAug 2019
Appointed person for lifting
Cpcs operatorsJun 2019
Recommendations

Michael rosenblum
Pre-Owned Director - Crowley Car CompanySan Diego County, California, United States
Stacy belue
Real Estate Agent at Innovate Real Estate Myrtle BeachGreater Myrtle Beach Area
Jürgen schulz
Product Owner & Team Lead at Mettler-Toledo International, IncSchweiz
Luca pieri
Special Processes EngineerCastel San Pietro Terme, Emilia-Romagna, Italy
Kalpesh parab
Team Lead | Finance Professional | Process Improvement | Accounting & Finance | Financial modellingPune, Maharashtra, India
Elisavet stamataki
PhD BioarchaeologyBrussels Region, Belgium
Kevin pendergast, cfp®
Private Wealth Advisor & Fee-Only Financial Planner at Brownson, Rehmus & FoxworthGreater Phoenix Area
Patrick sakala
Projects coordinator at i engineering GroupZambia
Matthieu delas
Strategic Sales Engineer at Visa Acceptance ServicesBelfast Metropolitan Area
Rohaan mehmood
Project EngineerGregadoo, New South Wales, Australia
...